Fig. P
1 |
2 |
Miter gauge storage (Fig. Q)
Storage for miter guage (1) is located on the right side of the stand. Hang the miter gauge on the hook (2).
Fig. Q
1
ASSEMBLING THE TABLE EXTENSION (FIG. S)
1.Place the left table extension next to the saw table, aligning the mounting holes (1).
2.Bag “Q” - Place three bolts with washers (2) and thread in mounting holes.
3.Place a straight edge or combination square on the saw table, across the table extension.
4.Adjust the mounting bolts (2) until the extension is flush with the saw table, and tighten.
NOTE: Extensions will not be flush on outer edges at this time until rails are installed.
5.Repeat these procedures for the right table
extension.
2
Fig. S | 1 |
2
Rip fence storage (Fig. R)
Storage brackets for the rip fence (1) is located on the left side of the stand. Place the rip fence on the two hooks (2).
Power cord storage (Fig. R)
Storage for the power cord (3) is located on the left side of the stand. Wrap the power cord onto the brackets (4) when saw in not in use. This can prevent damage to the cord.
Fig. R | 4 | 3 |
|
| |
| 1 |
|
ASSEMBLING THE FRONT AND REAR TABLE RAIL (FIG. T, U)
Assembly the front rail (Fig. T)
1.Identify the right front rail (1) and the left front rail (2) by rail scales (3).
2.Bag “R” - Attach the right front side cover (4) into right front table rail (1). Repeat for the left front rail.
3.Bag “S” - Place four long hex bolts (5), two short hex bolts (6) through the holes at the front table edge. Screw the square nuts (7) onto each bolts.
NOTE: Keep the bolts and square nuts loosened before attaching front rail.
4.Attach the right front rail onto proper location by having the square nuts pass through the slot of the front rail. Repeat for the left front rail.
5.Attach the middle plug (8) to connect the two front rail halves.
6.With the blade installed, use the rip fence and gauge to adjust the front rail to proper location. When the front rail is level with table, then fix the front rail by tightening the six bolts. NOTE: Place straight edge across table and extension and lift rail until edge is flush, then tighten bolts. Repeat for other side.
Fig. T
2
2
1 0
0
1
3
– 16 –
6
5
5 | 7 | 6 |
|
|
8
14