Installation
Install battery cable lug, nuts and washers in the order illustrated. The battery cable lug should be the first item installed on the stud. It should make solid contact with the mounting surface. Do not install hardware in a different order than shown.
13 mm Nut | M8 x 1.25 Stud | |
| ||
Flat Washer | Lock Washer | |
Mounting Surface | Battery | |
Insulator | ||
Cable Lug | ||
|
Figure 9 Required Order of Battery Cable Hardware
CAUTION: Fire Hazard
Never install extra washers or hardware between the mounting surface and the battery cable lug. The decreased surface area can build up heat.