Installation
Functional Test
Once the mounting, wiring, and other installation steps are completed, proceed to the International Series GFX Operator’s Manual. The Operator’s Manual has steps for powering up and performing a functional test on the inverter system, as well as powering down and adding new devices to an existing system.
Refer to the system display manual for programming instructions and menus.
32 |