Outback Power Systems GFX1424E, GFX1312E, GFX1448E Parallel Stacking Dual-Stack and Larger

Page 30

Installation

Parallel Stacking (Dual-Stack and Larger)

In parallel stacking, two or more inverters are stacked to create a single, common 230 Vac bus.

All inverters share a common input (AC source) and run loads on a common output.

Up to ten inverters may be installed in a parallel arrangement. The example on this page shows three inverters. The wiring diagram on the next page shows four.

3.9 kVA

230 Vac

1.3 kVA 230 Vac

1.3 kVA 230 Vac

1.3 kVA 230 Vac

Figure 20 Example of Parallel Stacking Arrangement (Three Inverters)

When installing a parallel system, the following rules must be observed.

Parallel stacking requires a system display and a HUB.

The inverter that is mounted physically lowest is always the master and is programmed as Master. (See the system display manual for programming.) Mounting below the other inverters allows the master to avoid heat buildup and remain relatively cool, as it sees the greatest duty cycle.

The master must be connected to port 1 of the HUB. Other inverters must not be selected as master.

All slave inverters, regardless of quantity, should be selected as OB Slave L1 during programming.

All inverter wiring and input breakers must be sized for 30 Aac or less.

All inverters must be of the same model.

The AC input (generator or utility grid) must be 230 Vac at 50 Hz (single-phase).

When wiring the AC source to the inverters, local codes may require the inverter breakers to be located at the bottom of the main panel. This prevents overloading of the AC bus.

28

900-0111-01-00 Rev A

Image 30 Contents
International Series GFX Inverter/Charger Trademarks Symbols Used AudienceGeneral Safety DefinitionsPersonal Safety Inverter SafetyBattery Safety Earth 911.com Regulatory ListingsRecycling Information OurEarth.orgEuroRecycle.net Table of Contents List of Tables Welcome to OutBack Power Technologies ModelsComponents and Accessories IntroductionPlanning ApplicationsBattery Bank Renewable EnergyGenerator Planning Planning Dimensions Location and Environmental RequirementsTools Required MountingTerminals, Ports, and Features Terminals and PortsGrounding DC Ground LugDC Wiring DC Conductor Size and Torque Requirements InverterRequired Order of Battery Cable Hardware AC Wiring Multiple AC SourcesAccessory Wiring Accessory ConnectionsAUX Wiring AUX Connections for Vent Fan ExampleTwo-Wire Generator Start Example Automatic Generator Start AGSThree-Wire Generator Start Example Single-Inverter Installations Single-Inverter WiringMultiple-Inverter Installations Stacking Stacking ConnectionsParallel Stacking Dual-Stack and Larger Example of Parallel Stacking Arrangement Three InvertersParallel Wiring Four Inverters Three-Phase Stacking Example of Three-Phase Stacking Arrangement Three InvertersThree-Phase Wiring Three Inverters Functional Test Installation Installation Index Index Index Arlington, WA 98223 USA 34.93.654.9568 360.435.6030 Rev a