2.Unbolt the bandsaw from the pallet.
3.With two assistants to steady the bandsaw, slowly lift it just enough to clear the pallet and floor obstacles, then move it to the prepared location.
4.Use shims between the machine mounting flanges and the floor to level the bandsaw.
Note: Tighten the mounting fasteners evenly to avoid warping or cracking the cast iron base.
Test Run
Once the bandsaw is in place, test run your machine to make sure it runs properly and is ready for regular operation. The test run consists of verifying the following: 1) The bandsaw motor powers up and runs correctly, and 2) the stop but- ton safety feature works correctly.
If, during the test run, you cannot easily locate the source of an unusual noise or vibration, stop using the machine immediately, then review Troubleshooting on Page 39.
If you cannot find a remedy, contact our Tech Support at (570)
To test run the bandsaw:
1.Read and follow the safety instructions at the beginning of the manual, and make sure the machine is setup properly.
2.Clear all tools and objects used during setup away from the machine.
3.Make sure the blade is properly tensioned and the blade guides are positioned correctly (refer to Blade Tensioning on Page 29, and Adjusting Blade Guides on Page 31 for detailed instructions).
4.Connect the machine to the power source.
G8144Z/G8145Z/G8146Z (Manufactured Since 6/11)
5.Model G8146Z only:
a.Place the key in the Power Switch and turn it to the ON
b.Push the Emergency Stop button in, then twist it clockwise so it pops out. When the Emergency Stop button pops out, the switch is reset and ready for operation.
c.Push the Start button to turn the machine
ON.
6.Models G8144Z & G8145Z only: Push the Start button in to turn the machine ON.
7.Verify that the machine is operating cor- rectly.
8.Verify that the motor is running in the correct direction.
Model G8144Z/G8145Z Control Panel
&Inverter Wiring Diagram on Page 46, or the Model G8146Z Inverter Wiring Diagram on Page 49 for detailed illustra- tions).