Harbor Freight Tools 97520 operating instructions Loading Brads

Page 7

5.Connect the air supply to the tool at the Quick Connector (83). Set the regulator at the recommended 70 to 120 operating PSI. Do not exceed the maximum 120 PSI.

6.Test the tool by depressing the Safety (50A) against the workpiece without pulling the Trigger (36). The tool must not cycle (fire). If it cycles (fires), stop immediately and have it repaired by a qualified service technician.

7.Hold the tool away or off the workpiece. The Safety (50A) of the tool should return to its original position. Squeeze the Trigger (36). The tool should not cycle (fire). If the tool cycles (fires), stop immediately and have it repaired by a qualified service technician.

8.Depress the Safety (50A) against the workpiece and squeeze the Trigger (36). The tool must cycle (fire) only once. Release the Trigger and squeeze it again. The tool must not cycle (fire). With the Trigger held, carefully lift the Nailer and press it against the workpiece again. The tool must not cycle (fire). If it fails to perform in the manner explained in bold, have it repaired by a qualified service technician.

LOADING BRADS

WARNING: Always wear ANSI approved impact safety goggles when reloading or performing any other maintenance on this tool. Other people in the work area must also wear ANSI approved impact safety goggles.

1.Slide the Pusher (63) back until it locks in place.

2.Place a full clip of the desired size Brads (3/4” to 2”) in the Magazine Assembly (70). Up to 100 Brads may be loaded in the Magazine.

Magazine

Assembly (70)

Pusher (63)

REV 08g

SKU 94481

For technical questions, please call 1-800-444-3353

PAGE 7

Image 7
Contents Distributed exclusively by Harbor Freight Tools For technical questions or replacement parts, please callSave this Manual Product SpecificationsSafety Warnings and Precautions Read all instructions before using this toolSKU For technical questions, please call Page Unpacking California Health & Safety Code 25249.5, et seqOperation Testing the Full Sequential Safety Trip MechanismLoading Brads Do not exceed the maximum 120 PSI Operating the NailerClearing Jams Troubleshooting INSPECTION, MAINTENANCE, and CleaningAnytime any maintenance or repairs are done, First Please Read the Following Carefully Parts ListAssembly Diagram Mission Oaks Blvd. PO Box 6009 Camarillo, CA 93011 800