Harbor Freight Tools 93760 operating instructions Assembly Diagram

Page 13

ASSEMBLY DIAGRAM

86:Nails not shown.

87:Nails not shown.

88:Goggles not shown.

89:Tool Oil not shown.

90:Hex Wrenches not shown.

91:Carrying Case not shown.

NOTE:

Some parts are listed and shown for illustration purposes only,

and are not available individually as replacement parts.

SKU 93760

For technical questions, please call 1-800-444-3353

PAGE 13

Image 13
Contents For technical questions, please call Framing NailerSafety Warnings and Precautions Product SpecificationsSave this Manual REV 11/06, 01/07 SKU For technical questions, please callSKU For technical questions, please call SKU For technical questions, please call Unpacking California Health & Safety Code 25249.5, et seqOperation Testing the Full Sequential Safety Trip MechanismLoading Nails Do not exceed the maximum 125 PSI Operating the NailerFor technical questions, please call Rev 11/06 SKU Remove the two Screws 35. One Screw on each side of Magazine Clearing JamsAnytime any maintenance or repairs are done, First INSPECTION, MAINTENANCE, and CleaningProblem Possible Solution TroubleshootingDescription Parts ListAssembly Diagram Please Read the Following Carefully