Intec manual LOADING THE MFN-200, Loading The Tool

Page 5
LOADING THE MFN-200

LOADING THE MFN-200

EYE PROTECTION which conforms to ANSI specifications and provides protection against flying particles both from the FRONT and SIDE should ALWAYS be worn by the operator and others in the work area when loading, operating or servicing this tool. Eye protection is required to guard against flying fasteners and debris, which could cause severe eye injury.

The employer and/or user must ensure that proper eye protection is worn. Eye protection equipment must conform to the requirements of the American National Standards Institute, ANSI Z87.1 and provide both frontal and side protection. NOTE: Non-side shielded spectacles and face shields alone do not provide adequate protection.

TO PREVENT ACCIDENTAL INJURIES:

Never place a hand or any other part of the body in nail discharge area of tool.

Never point the tool at anyone else.

Never engage in horseplay.

Always handle the tool with care.

Do not contact the actuator while loading the tool.

LOADING THE TOOL

1.Release the pusher spring clip and remove the pusher blade.

2.Load the fasteners into guide channel.

3.Insert rounded end of pusher blade into channel to retain fasteners.

4.Latch pusher spring clip to notched end of pusher blade. Ensure sufficient engagement of pusher blade for smooth fastener feeding.

1.

2.

3.

4..

LOADING THE TOOLManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background Fastener may not feed consistently if pusher blade is not installed.

BEFORE HANDLING OR OPERATING THIS TOOL READ AND UNDERSTAND THE WARNINGS CONTAINED IN THIS MANUAL.

5

Image 5
Contents MFN-200 MANUAL FLOORING NAILER CLAVADORA MANUAL PARA PISOSCLOUEUSE MANUELLE À PLANCHER INTRODUCTION 7-YEAR LIMITED WARRANTY - U.S. and Canada OnlyINDEX Safety Instructions Tool Specifications Loading the ToolLOADING TOOL SAFETY INSTRUCTIONSOPERATION MAINTAINING THE TOOLMFN-200 FASTENER SPECIFICATIONS MFN-200 TOOL SPECIFICATIONSMFN-200 Tool ModelLOADING THE TOOL LOADING THE MFN-200NOTE REGARDING THE USE OF THIS TOOL TO INSTALL PRE-FINISHED FLOORING FASTENER DEPTH MAINTENANCETool MalletFor more information log on to BOSTITCH FLOORING PRODUCTSMIIIFS/MIIIFN Pneumatic Flooring ToolsÍNDUCE INTRODUCCIÓNNOTA GARANTÍA LIMITADA DE 7 AÑOS - Sólo EE.UU. y CanadáAL CARGAR LA HERRAMIENTA INSTRUCCIONES DE SEGURIDADOPERACIÓN MANTENIMIENTO DE LA HERRAMIENTAModelo de ESPECIFICACIONES DE LA HERRAMIENTA MFN-200ESPECIFICACIONES DE FIJACIONES MFN-200 CARGA DE MFN-200 FUNCIONAMIENTO MANTENIMIENTO LA PROFUNDIDAD DE LA FIJACIÓNHerramienta MazoPara obtener más información visite PRODUCTOS BOSTITCH PARA PISOSHerramienta neumática para pisos SX150-BHF-2 Engrapadora para pisos de madera calibre MIIIFOOT-KITINDEX INTRODUCTIONREMARQUE GARANTIE LIMITÉE 7 ANS - États-Unis et Canada seulementCHARGEMENT DE L’APPAREIL CONSIGNES DE SÉCURITÉFONCTIONNEMENT ENTRETIEN DE L’APPAREILSPÉCIFICATIONS DES ATTACHES MFN-200 SPÉCIFICATIONS DES OUTIL MFN-20038,1 mm 50,8 mmCHARGEMENT DU MFN-200 FONCTIONNEMENT PROFONDEUR DE FIXATION MAINTENANCEOutil MailletPour plus de renseignements, allez au PRODUITS BOSTITCH POUR PLANCHERNOTES AND RECORDS NOTAS Y REGISTROS REMARQUES ET RAPPORTS