Carrier 50VS specifications A50-8332, System Expansion Loops

Page 10

 

 

 

 

DIRECT RETURN

 

 

 

 

 

REVERSE RETURN

 

 

 

 

REVERSE RETURN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a50-8332

 

 

 

 

WITH A COMMON REVERSE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RETURN RISER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 7 — System Piping Arrangements

All riser modifications necessitated by variations in floor-to- floor dimensions including cutting off or extending risers is the sole responsibility of the installing contractor.

Additional expansion compensation must be made in the riser system in the field where movement is expected to exceed the factory allowances. Figure 9 displays the expansion charac- teristics of risers compared to water temperature differential. Assuming a minimum water temperature of 20 F and a maximum water temperature of 120 F, the temperature differ- ence of 100 F indicates 90 feet of riser will expand or contract 1 inch. To eliminate stress, a riser system must be anchored at least once to the building structure. Technical information on pipe expansion, contraction and anchoring can be found in the ASHRAE HVAC Systems and Equipment Handbook and vari- ous other technical publications. Riser expansion and the an- choring of each unit is the responsibility of the design engineer and installing contractor.

RISER CONNECTIONS — Install cabinet with risers as follows:

1. Move cabinet into position.

Pressure Drop - Ft Water/100 Ft of Riser

3.0

4.0

 

5.0 6.0 7.0 8.0

10

 

20

 

30

40

50

60 70 80

 

100

 

15

 

 

IZE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15

 

PIPE

S

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

inch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

/4

 

inch

 

inch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

1

-1/4

 

 

inch

 

 

 

 

 

 

 

 

 

 

inch

9.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9.0

 

 

 

 

 

 

 

1

 

-1/2

 

 

 

 

 

 

 

 

 

 

8.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

-1/2

8.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.0

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

7.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6 ft/s

 

 

 

6.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

inch

 

 

 

 

 

 

6.0

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5 ft/s

4.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.0

3.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4 ft/s

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

per

s

econd)

 

 

 

 

2.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(feet

 

 

 

 

 

 

2.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3 ft/s

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ter

Velocity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2 ft/s

 

W

a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.0

4.0

 

5.0 6.0 7.0 8.0

10

 

20

 

30

40

50

60 70 80

 

100

 

a50-8333

 

 

Water Flow Rate - GPM

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 8 — Friction Loss of Risers

CAUTION

Keep risers off the floor while moving the cabinet. Failure to heed this warning could result in equipment damage.

2.Be sure that all the copper fittings are clean and free of dirt. Raise the cabinet upright and lower it into the riser from the floor below.

NOTE: The top of each riser is equipped with a 3 in. deep swaged connection. There is sufficient extension at the bottom to allow insertion of approximately 2 in. of the riser into the swaged top of the riser below.

3.Center risers in the pipe chase and shim the cabinet level. Plumb risers in two planes to assure proper unit operation and condensate drainage.

4.Attach the cabinet assembly to the floor and the building structure on at least two sides using sheet metal angles (field provided). A field-provided base vibration dampen- ing pad can be used to help eliminate transfer of any vi- bration to the structure. If vibration dampening pads are used some rough-in dimensional changes will need to be considered before installation due to style and thickness of the pads. Additional anchorage can be provided by in- stalling brackets at the top of the cabinet (field provided).

5.DO NOT attach drywall studs to the equipment cabinet.

 

550

 

 

 

 

 

 

 

- Ft

500

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

sion

450

 

 

 

 

 

 

 

Expan

400

 

 

 

 

 

 

 

in.1/2-

350

 

 

 

 

 

 

 

and 1

300

 

 

 

 

 

 

 

250

 

 

 

 

 

 

 

in.

 

 

 

 

 

 

 

 

 

 

1-1/2”

 

 

 

 

1

200

 

 

 

 

 

 

 

 

 

 

 

 

 

th for

 

 

 

 

 

 

 

150

 

 

 

 

 

 

 

g

 

1”

 

 

 

 

 

 

 

 

 

 

 

 

Len

 

 

 

 

 

 

 

100

 

 

 

 

 

 

 

Riser

 

 

 

 

 

 

 

50

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0

40

60

80

100

120

140

160

 

20

 

Water Temperature Difference - F

 

Fig. 9 — Allowable Riser Lengths Between

a50-8334

System Expansion Loops

 

 

10

Image 10
Contents Safety Considerations ContentsGeneral Installation Physical Data 50VS Unit50VSE,F 50VSG,H Dimension a Water Coil Unit ConnectionDRAINa50-8295 50VSM,NA50-8291 Dimensional Data10 x 16 x A50-8296Cabinet 14 xA50-8300 A50-8298A50-8297 A50-8299 A50-8301Install Cabinet and Riser A50-8331.eps Framing Rough-In DetailA50-8332 System Expansion LoopsType Temperature Protection Antifreeze Percentages by VolumeMinimum Temperature for LOW 10 F 15 F 20 F 25 FCondition Closed Open Loop and Recirculating Well Water Quality GuidelinesRECIRCULATING† Wire Field Power Supply Connections Chassis Electrical Data 50VS UnitTypical 50VS Unit Control Wiring A50-8352Recommended Wire Gage Low Voltage Thermostat Wire Field Control ConnectionsInstall Hose Kit Maximum RUN Unit toA50-8293 Install Chassis into the CabinetInstall Return Panel Hose Diameter Bend AllowanceA50-8302.eps Install Supply GrillePRE-START-UP Supply Grille Sizes and ArrangementsSystem Checkout DIP Switch Settings and OperationField Selectable Inputs Standard 24-vac Sequence of Operation START-UPWater Flow GPM Rise Drop Cooling F Heating F Temperature Change Through Heat ExchangerOperating Limits 20-26 10-17 Systems at 1.5 gpm per tonWater Coil Maintenance ServiceTroubleshooting Troubleshooting LED1 LED2 LED3 LED4START-UP Checklist II. START-UPHeating Cycle Analysis Cooling Cycle Analysis