Allied Air Enterprises manual 4PGE/SG13,15 Series

Page 1

INSTALLATION AND MAINTENANCE INSTRUCTIONS

4PGE/SG(13,15) Series

Gas Heating/Electric Cooling Package Unit

Save these instructions for future reference

WARNING

Improper installation, adjustment, alteration, service, or maintenance can cause injury or property damage. Refer to this manual. For assistance or additional information, consult a qualified installer, service agency, or the gas supplier.

WARNING

Do not store combustible materials, including gasoline and other flammable vapors and liquids, near the furnace, vent pipe, or warm air ducts. Such actions could cause property damage, personal injury, or death.

WARNING

Never use a flame to check for gas leaks. Explosion causing injury or death may occur.

WARNING

If this unit is to be installed in a mobile or manufactured home application, the ductwork must be sized to achieve static pressures within the manufacturer’s guidelines. All other installation guidelines must also be followed. Failure to do so may result in equipment damage, personal injury, and improper performance of the unit.

TABLE OF CONTENTS

 

SAFETY

2

INSTALLATION

2

START-UP

10

OPERATION

11

MAINTENANCE

13

CONTROL SYSTEM DIAGNOSTICS

14

WIRING DIAGRAMS

15

Manufactured By

Allied Air Enterprises Inc.

A Lennox International Inc. Company

215 Metropolitan Drive

West Columbia, SC 29170

*506488-01*

CAUTION

The installation of the furnace, wiring, warm air ducts, venting, etc. must conform to the requirements of the National Fire Protection Association; the National Fuel Gas Code, ANSI Z223.1 (latest edition) and the National Electrical Code, ANSI/ NFPA No. 70 (latest edition) in the United States; the Canadian Installation Codes CAN/CGA-B149.1 & .2 (latest edition) and the Canadian Electrical Code Part 1, CSA 22.1 (latest edition) in Canada; and any state or provincial laws, local ordinances, or local gas utility requirements. Local authorities having jurisdiction should be consulted before installation is made. Such applicable regulations or requirements take precedence over the general instructions in this manual.

506488-01

Issue 1008

Page 1

Image 1
Contents 4PGE/SG13,15 Series Installation SafetyInspection Location Using Accessory Lift KitRoof Curb Assembly Clearances Roof Curb InstallationService Access Minimum Clearance RequirementsCarbon Monoxide Poisoning Hazard Installing Vent HoodVent Hood Existing Venting SystemsFilters Condensate DrainRemoving Bottom Duct Covers DuctworkFire or Explosion Hazard Gas and Electrical AccessMinimum Required Surface Area For Disposable Filters LPG/Propane Units, Tanks, and PipingCompressor Typical Wiring Connections Single Phase Three PhasePre-Start Check List START-UPTo Light Burners To Shut Down BurnersOperation Blower Delay CoolingCooling Sequence of Operation System PerformanceHeating System Adjusting Airflow Variable Speed Motor Equipped Units OnlyHeating Sequence of Operation Circulating Air BlowerMaintenance Electrical SHOCK, Fire Or Explosion Hazard Burners Fault CodesTypical Flame Appearance Outdoor CoilDiagram PSC Motor Connection Single Phase Connection Diagram Single Phase Variable Speed Motor