Prime Empty System
Prime Empty System
Prime A and B Fluids
Wear gloves when using flush solvents and/or if the fluid temperature exceeds 110°F (43°C).
NOTE: The equipment is tested with mineral oil at the factory. If necessary, flush out the oil with a compatible solvent before spraying. See Empty and Flush Entire System (new system or end of job), page 29.
Do not install the gun spray tip yet. To avoid splash- ing, use the lowest pressure possible to prime.
1.Condition the materials prior to adding to the hop- pers (J). Ensure that the resin materials are thor- oughly mixed, homogenous, and pourable prior to adding to the hopper. Stir the hardeners back into suspension prior to adding material to hopper.
2.Fill the A and B reservoirs with proper materials. Fill the A side (blue) with major volume of material; fill the B side (green) with minor volume of material (unless 1:1 mix ratio).
J
3. Move the recirculation lines (U) to empty containers.
U
4.Close the dual shutoff handle (AE) and open the cir- culation handle (AC).
AC
AE
5. Open the main air shutoff valve (CA).
CA
6.Slowly open the air regulator (CB).
7.Dispense fluid into the containers until clean fluid comes out of the A and B recirculation lines.
8.Decrease air pressure. Close the main air shutoff valve (CA).
9.Move the recirculation lines (U) back to the correct hopper (J).
10.If using heaters, heat fluid throughout system before spraying. See Recirculate Prior to Spraying or