Grizzly G0517g Installing/Removing Drawbar Tooling, To install the drawbar with attached tooling

Page 19

Installing/Removing

Drawbar Tooling

The Model G0517 includes an M12-1.75 drawbar. Use the drawbar to connect the included drill chuck arbor or an aftermarket end mill holder. See Page 23 for recommended end mill holders.

Always DISCONNECT MACHINE FROM POWER when installing or removing tooling.

To install the drawbar with attached tooling:

1.Make sure the spindle and tooling tapers are clean and free of any debris or grease.

2.Make sure the drawbar is firmly threaded into the tooling (Figure 23).

Figure 23. Drawbar threaded into the included

drill chuck arbor.

3.Insert the drawbar into the spindle and lodge the tooling and spindle tapers together, as shown in Figure 24.

Figure 24. Inserting tooling into spindle.

Model G0517 Mill/Drill

4.Hand tighten the hex nut and flat washer on the drawbar threads that project out of the spindle pulley, as shown in Figure 25.

Figure 25. Tightening nut on drawbar.

5.Snug the drawbar hex nut down 12 a turn.

To remove the drawbar and tooling:

1.Loosen the drawbar hex nut and unthread it to the top of the drawbar without removing it (Figure 26).

Figure 26. Nut unthreaded to top of drawbar.

2.Using a brass hammer, tap the drawbar from the top, as shown in Figure 27, with light blows until the tooling and spindle tapers release.

Figure 27. Tapping drawbar with hammer.

3.Hold the tooling with one hand and remove the drawbar hex nut with the other hand.

4.Remove the drawbar and tooling assembly from the spindle.

-17-

Image 19
Contents Model G0517 MILL/DRILL Page Table of Contents Foreword IntroductionContact Info Machine Data Sheet Model G0517 Mill/Drill Identification Safety Instructions for Machinery SafetyAlways Lock Mobile Bases if Used Before Operating Machinery Additional Safety for Mill/Drills Operation Circuit RequirementsInventory SET UPItems Needed for Set Up UnpackingMinimum Working Clearances Clean UpSite Considerations Floor LoadTo assemble the mill/drill AssemblyPage To test run the machine Test RunHead/Quill Travel OperationsTable Travel To install a sleeve Installing/Removing Morse Taper SleevesTo remove a sleeve To install the drawbar with attached tooling Installing/Removing Drawbar ToolingTo remove the drawbar and tooling To change speeds Installing Drill ChuckTo install the drill chuck Changing SpeedsDrilling Drilling Speeds Using the Drill Bit Speed ChartLubrication Suggestions Example Milling SpeedTo determine the needed speed for milling Cutting Speeds for High Speed Steel HSS Cutting ToolsG3640-Power Twist V-Belt 1⁄2 x AccessoriesH5685-4Rotary Table H3022-Measurement Tool Set G9765-9-PC. Ball End Mill SetG1076-52-PC. Clamping Kit Lubrication MaintenanceSchedule Unpainted Cast IronTo adjust the gibs Adjusting GibsOil Fittings Symptom Possible Cause Possible Solution ServiceAbout Service TroubleshootingMill/Drill Operations Electrical Components Wiring DiagramStand/Base Parts Breakdown Description Stand/Base Parts ListHeadstock Parts Breakdown Description Headstock Parts ListWarranty and Returns Page Comments Warranty CardBOX BELLINGHAM, WA Grizzly INDUSTRIAL, INCPage Call Today For a Free Full Color Catalog