Grizzly G0517g instruction manual Test Run, To test run the machine

Page 16

Test Run

The purpose of a test run is to make sure your machine and its safety components are function- ing correctly. The machine should remain discon- nected from power until instructed otherwise.

To test run the machine:

1.Loosen the lock knobs on both sides (Figure 14), tighten the V-belts by pulling and holding tension on the belt tension lever, then tighten the lock knobs.

Belt Tension

 

Lever

Lock Knob

Figure 14. Using the belt tension lever to

tighten/loosen the belts.

2.Clear all tools and other components away from the mill/drill, and ensure that the belt cover is closed.

3.Make sure you are familiar with the machine safety and controls.

Wear safety glasses whenever starting or using machine. Failure to comply may result in serious personal injury.

Keep loose clothing rolled up and out of the way of machinery and keep hair pulled back.

4.Connect the drill press to the power source.

5.Turn the machine ON. The mill/drill should run smoothly, with little or no vibration or rub- bing noises.

—If you notice anything unusual about the operation, turn the machine OFF, discon- nect power, and investigate/correct the problem before operating further.

—If you cannot easily locate the source of a potential problem, refer to Troubleshooting on Page 26 or contact our Technical Support at (570) 546-9663.

6.Remove the switch key (yellow portion of the main switch), and try to turn the switch ON.

—If the machine does NOT turn ON with the key removed, then the safety feature is working as intended.

—If the machine turns ON with the key removed, then the safety feature is mal- functioning. Disconnect power to the machine and contact Tech Support imme- diately.

-14-

Model G0517 Mill/Drill

Image 16
Contents Model G0517 MILL/DRILL Page Table of Contents Foreword IntroductionContact Info Machine Data Sheet Model G0517 Mill/Drill Identification Safety Safety Instructions for MachineryAlways Lock Mobile Bases if Used Before Operating Machinery Additional Safety for Mill/Drills Circuit Requirements OperationSET UP Items Needed for Set UpUnpacking InventoryClean Up Site ConsiderationsFloor Load Minimum Working ClearancesAssembly To assemble the mill/drillPage Test Run To test run the machineHead/Quill Travel OperationsTable Travel To install a sleeve Installing/Removing Morse Taper SleevesTo remove a sleeve To install the drawbar with attached tooling Installing/Removing Drawbar ToolingTo remove the drawbar and tooling Installing Drill Chuck To install the drill chuckChanging Speeds To change speedsDrilling Drilling Speeds Using the Drill Bit Speed ChartLubrication Suggestions Milling Speed To determine the needed speed for millingCutting Speeds for High Speed Steel HSS Cutting Tools ExampleG3640-Power Twist V-Belt 1⁄2 x AccessoriesH5685-4Rotary Table H3022-Measurement Tool Set G9765-9-PC. Ball End Mill SetG1076-52-PC. Clamping Kit Maintenance ScheduleUnpainted Cast Iron LubricationTo adjust the gibs Adjusting GibsOil Fittings Service About ServiceTroubleshooting Symptom Possible Cause Possible SolutionMill/Drill Operations Wiring Diagram Electrical ComponentsStand/Base Parts Breakdown Stand/Base Parts List DescriptionHeadstock Parts Breakdown Headstock Parts List DescriptionWarranty and Returns Page Warranty Card CommentsGrizzly INDUSTRIAL, INC BOX BELLINGHAM, WAPage Call Today For a Free Full Color Catalog