Stow SFCS-16 manual Assembly, Removing the Floor Covering Scraper from the Pallet

Page 11

ASSEMBLY INSTRUCTIONS/OPERATION

Assembly

The STOW SFCS16 FLOOR COVERING SCRAPER is shipped from the factory secured on a specially designed wooden pallet and protected from external damage by a corrugated carton or wood crate. If shipped with a corrugated carton, the Surface Grinder is secured to the pallet with wood support strips. Remove the carton or crate immediately upon receipt using suitable tools to remove the nails.

REMOVING THE FLOOR COVERING SCRAPER FROM THE PALLET.

Tools Required:

1 each, cutting type pliers.

1 each, claw hammer or a hammer and an appropriate pry bar.

Remove the corrugated carton which is fastened to the pallet. The FLOOR COVERING SCRAPER is secured to the pallet with banding. Using the pliers, cut and remove the banding. The FLOOR COVERING SCRAPER can then be removed from the pallet.

DANGER

WEAR SAFETY GLASSES AND OTHER APPROPRIATE SAFETY APPAREL WHEN CUTTING THE BANDING AND/OR REMOVING THE CORRUGATED/WOOD SHIPPING CRATE.

Included in the shipment should be the following:

1 each, FLOOR COVERING SCRAPER main frame assembly.

1 each, extension cord with integral GFI.

1 each, adjustable section of the operator handle.

1 each, pack of standard blades.

The FLOOR COVERING SCRAPER is shipped from the factory completely assembled with the exception of the adjustable section of the operator handle. If ordered with the Surface Grinder, optional blades and accessories can be shipped separately or included in the shipping container.

Visually inspect the shipment for freight damage and/or missing parts. If shipping damage is evident, contact the delivering carrier immediately to arrange for an inspection of the damage by its claims representative. Federal law requires that a claim be filed within a specific time period. If missing parts are detected, notify your dealer or the Customer Service Department who will assist you in obtaining them.

Check all fasteners for proper security. Consult a fastener torque chart for the proper torque value if any fastener is found to require retorquing.

INSTALLATION OF THE ADJUSTABLE SECTION OF THE OPERATOR HANDLE.

The installation of the adjustable section of the operator will require a level working surface of sufficient size and appropriate height.

1)The FLOOR COVERING SCRAPER incorporates an operator handle design that folds for transport and storage. The handle is secured to the main frame at two locations; a pivoting (fixed) location secured by Allen head type capscrews and a retaining (locking) location secured by removeable, ball-detent type pins. The pins are secured to the main frame by lanyards.

2)To place the operator handle in the work position, move the handle upright so that the ball-detent pins can be inserted through the operator handle and main frame. Determine the ball-detent pins are properly inserted through the operator handle and main frame to fully expose the ball detent. FIGURE 1.

FIGURE 1

DANGER

THE BALL DETENT MUST BE FULLY EXPOSED AGAINST THE MAIN FRAME TO PROVIDE THE PROPER PIN RETAINING FORCE. AN IMPROPER PIN RETAINING CONFIGURATION CAN RESULT IN UNEXPECTED OPERATOR HANDLE MOVEMENT. THIS OCCURRENCE CAN RESULT IN PROPERTY DAMAGE AND/OR PERSONAL INJURY.

3)Remove the threaded knobs from the fixed section of the operator handle. Install the adjustable section into the fixed section with the handle grips facing

SFCS-16

OPERATION AND PARTS MANUAL REV #3 (02/23/06)

PAGE 11

 

 

 

Image 11
Contents Floor Covering Scraper Model SFCS-16 Page Stow SFCS-16 Floor Covering Scrapper Stow Construction Equipment Here’s how to get helpSFCS-16 Operation and Parts Manual REV #3 02/23/06 SFCS-16 Operation and Parts Manual REV #3 02/23/06 Operator Instructional Data Sheet Safety Precautions Operation MAINTENANCE, Repair and Storage Removing the Floor Covering Scraper from the Pallet AssemblyTheory of Operation Before Starting the MotorAngled Mastic Removal Blade Straight Beveled Scoring Blades Result in Property Damage AND/OR Personal Injury Assembly INSTRUCTIONS/OPERATION Assembly INSTRUCTIONS/OPERATION Assembly INSTRUCTIONS/OPERATION Transporting the Floor Covering Scraper OperationFloor Covering SCRAPER. Figure Adjusting the Operator Handle Height Assembly INSTRUCTIONS/OPERATION Assembly INSTRUCTIONS/OPERATION Assembly INSTRUCTIONS/OPERATION Assembly INSTRUCTIONS/OPERATION Assembly INSTRUCTIONS/OPERATION Stopping the Floor Covering Scraper on the Jobsite Assembly INSTRUCTIONS/OPERATION Preventative Maintenance Check List ServiceAssembly INSTRUCTIONS/OPERATION Electric Motor Service Requirements TroubleshootingOperational Problems Electric MotorStorage StorageGeneral SpecificationsFrame SFCS-16 Operation and Parts Manual REV #3 02/23/06 Explanation of Code in Remarks Column Recommended Spare Parts Adjustable Axle Assy Remarks Part Name QTYReplacement Cutting Blades Assy Part Name Frame Assy Part Name QTY Remarks Frame Assy SFCSSP80430 BEARING, Flange Operator Handle Assy HANDLE, Lower Decals Decals Part Name QTY Freight Policy Special Expediting ServicePRICING, Rebates Specifications Payment TermsSFCS-16 Operation and Parts Manual REV #3 02/23/06 FAX Heres HOW to GET Help