Miller Electric Dimension 1000 manual Connecting Input Power

Page 28

4-14. Connecting Input Power

9

 

= GND/PE Earth Ground

 

 

 

 

 

8

 

 

 

11

 

 

 

10

 

 

 

 

2

4

 

 

 

 

7

 

 

 

 

1

 

 

 

IMPORTANT

 

 

6

Input Terminal Board

 

 

 

 

 

L1 (U)

 

 

7

L2 (V)

 

4

 

L3 (W)

 

 

 

 

5

4

 

 

 

3

 

 

 

 

 

 

GND/ PE Earth Ground

Tools Needed:

3/8 in 3/8 in

11/16 in

! Installation must meet all National and Local Codes − have only quali- fied persons make this installation.

! Disconnect and lockout/tagout in- put power before connecting input conductors from unit.

! Make input power connections to

the welding power source first.

! Always connect green or green/yel- low conductor to supply grounding terminal first, and never to a line ter- minal.

See rating label on unit and check input volt- age available at site.

1Input Power Conductors (Customer Supplied Cord)

Select size and length of conductors using Section 4-12. Conductors must comply with national, state, and local electrical codes. If applicable, use lugs of proper amperage capacity and correct hole size.

Welding Power Source Input Power Connections

2 Strain Relief

Route conductors (cord) through strain re- lief and tighten screws.

3Machine Grounding Terminal

4Green Or Green/Yellow Grounding Conductor

5Reed Switch (Ground Current Sensor) (Optional)

Connect green or green/yellow grounding conductor to welding power source ground- ing terminal first. If unit is equipped with op- tional ground current sensor, route ground- ing conductor through reed switch two times and connect to grounding terminal.

6Welding Power Source Line Terminals

7Input Conductors L1 (U), L2 (V) And L3 (W)

Connect input conductors L1 (U), L2 (V) and L3 (W) to welding power source line ter- minals.

Close and secure access door on welding power source.

Disconnect Device Input Power Connec- tions

8Disconnect Device (switch shown in OFF position)

9Disconnect Device (Supply) Grounding Terminal

Connect green or green/yellow grounding conductor to disconnect device grounding terminal first.

10 Disconnect Device Line Terminals

Connect input conductors L1 (U), L2 (V) And L3 (W) to disconnect device line terminals.

11 Overcurrent Protection

Select type and size of overcurrent protec- tion using Section 4-12(fused disconnect switch shown).

Close and secure door on line disconnect device. Remove lockout/tagout device, and place switch in the On position.

Ref. 800 103-C / Ref. 802 295

OM-2223 Page 24

Image 28
Contents Description ProcessesFile Multiprocess From Miller to You Table of Contents Page Symbol Usage Arc Welding HazardsElectric Shock can kill HOT Parts can cause severe burnsFumes and Gases can be hazardous ARC Rays can burn eyes and skinWelding can cause fire or explosion Flying Metal or Dirt can injure eyesWelding Wire can cause injury Fire or Explosion hazardFalling Unit can cause injury Moving Parts can cause injuryPrincipal Safety Standards California Proposition 65 WarningsEMF Information About Implanted Medical DevicesSymboles utilisés UNE Décharge Électrique peut entraîner la mortLES Fumées ET LES GAZ peuvent être dangereux DES Pièces Chaudes peuvent provoquer des brûlures gravesLE Soudage peut provoquer un in cendie ou une explosion LE Bruit peut endommager l’ouïe LES Bouteilles peuvent exploser si elles sont endommagéesRisque D’INCENDIE OU D’EXPLO- Sion LA Chute DE L’APPAREIL peut blesserLES Fils DE Soudage peuvent provoquer des blessures Proposition californienne 65 AvertissementsLE Soudage À L’ARC risque de provoquer des interférences Information EMF Principales normes de sécuritéEn ce qui concerne les implants médicaux Work like a Pro Symbol Definitions SpecificationsI1max I1effDuty Cycle And Overheating 100% Duty CycleCC Mode CV Mode Volt-Ampere CurvesSelecting a Location MovementDimensions Dimensions And WeightsWeight Do not move or operate unit where it could tip Turn Off power beforeTipping Weld output terminalsBasic Sub Arc SAW Welding Basic Sub Arc SAW Equipment ConnectionsControl Settings For Sub Arc SAW Welding Welding Power Source Sensing Leads Placement Guidelines For Multiple Arcs BetterSelecting Cable Sizes Remote 14 Receptacle And Terminal Strip 1T InformationConnecting Remote Control Turn off power before con- necting to receptacleElectrical Service Guide Placing Jumper LinksWelding Power Source Input Power Connections Connecting Input PowerDisconnect Device Input Power Connec- tions − Operation ControlsFuse F1 Routine MaintenanceMonths Troubleshooting Trouble Remedy− Electrical Diagram 236 682-A − Parts List PLG14 Panel, Front w/Components -1Item PLG10 Rectifier, SCR Main -1Item Panel, Rear w/Components -1Item Page Page Page Service SupportOwner’s Record Miller Electric Mfg. Co