Cisco Systems A9014CFD, ASR 9014CFD manual Attaching the Rack-Mounting Brackets

Page 31

Chapter 3 Installing the Cisco ASR 901 Mobile Wireless Router

Mounting the Cisco ASR 901 Router

Attaching the Rack-Mounting Brackets

Complete the following tasks to install, replace, or rearrange the rack-mounting brackets so you can then mount the Cisco ASR 901 router in a 19-inch (48.3-cm) equipment rack. You can use the same rack-mounting brackets to front-mount the Cisco ASR 901 router in the equipment rack.

Step 1 Locate the mounting holes of the Cisco ASR 901 router.

Step 2 Align the rack-mounting bracket with the Cisco ASR 901 router and position with the four #6-32 x 0.25-inch screws (provided) (see Figure 3-1for front-mounting).

Figure 3-1 Attaching the Bracket for Front-Mounting

282344

1

1

Rack mount bracket

Step 3 Insert the screws (four places) and tighten using a Number 2 Phillips screwdriver.

Step 4 Repeat Steps 2 and 3 for the other rack-mounting bracket.

Proceed to the next section, “Mounting the Cisco ASR 901 Router in a Rack” to continue the installation.

Mounting the Cisco ASR 901 Router in a Rack

Typically, the Cisco ASR 901 router mounts to a 19-inch (48.3-cm) 2-post equipment rack with rack-mounting brackets that attach toward the front of the router sides. The inside width between the two posts or mounting strips (left and right) must be at least 17.72 to 17.80 inches [45 to 45.21 cm]. For more information about the equipment rack, see “Hardware Description” section on page 1-1.

No vertical clearance is necessary above or below the router when it is mounted in the rack.

Cisco ASR 901 Series Aggregation Services Router Hardware Installation Guide

 

OL-23778-01

3-3

 

 

 

Image 31
Contents Text Part Number OL-23778-01 Americas HeadquartersPage N T E N T S Required Tools and Equipment Troubleshooting A-1 OL-23778-01 Revision Date Change Summary Document Revision HistoryConventions ObjectivesAudience OrganizationRelated Documentation Safety WarningsAbout This Guide Hardware Description IntroductionCisco ASR 901 Router Front View Cisco ASR 901 Router-Front View Cisco ASR 901 Router Ethernet Version Front ViewFan Grounding Point Lug Cisco ASR 901 Router Rear ViewLEDs Power SupplySafety Precautions Specification ValuePin Connector B Pin Connector aRouter Interface Numbering Environmental Monitoring Temperature SensorSystem Specifications Description SpecificationInterface Number Location Label Regulatory ComplianceSafety with Equipment Safety GuidelinesSafety with Electricity Preventing Electrostatic Discharge Damage Site Environment Power Supply ConsiderationsPrerequisites Site PlanningAir Flow Guidelines Method of ProcedureRequired Tools and Equipment Unpacking and Checking the Contents of your ShipmentTask Verified by Date Installation ChecklistTask Verified by Console Port ConsiderationsCreating a Site Log Console Port ConnectionsPreparing to Install the Router Console Port Considerations OL-23778-01 Network Modules Installing the Cisco ASR 901 Mobile Wireless RouterMounting the Cisco ASR 901 Router Rack-Mounting Configuration GuidelinesMounting the Cisco ASR 901 Router in a Rack Attaching the Rack-Mounting BracketsAttaching the Cable Guides Grounding the Cisco ASR 901 Router Connecting the Chassis Ground and PowerGrounding Point Stripping a Ground Wire Power Connection Compliance6-Pin Terminal Block Wiring the DC-Input Power SourceInstalling SFP Modules Installing and Removing SFP ModulesRemoving SFP Modules Installing an SFP Module into an SFP Module SlotConnecting the Console Port Connecting CablesConsole Port Types of RJ-45 CablesConnecting Gigabit Ethernet Interface Cables Connecting the Network CablesConnecting T1 and E1 Interface Cables Connecting Cables to the Bits Interface Connecting SFP CablesConnecting GPS Cables Dressing Router Cables Powering On the RouterConnecting to Alarm Port Connecting to the Management Ethernet PortInterpreting Front-Panel LEDs Checklist for Power UpPower-On Procedure Formatting Procedures for Flash MemoryDisplaying Contents of the Flash Memory File and Directory ProceduresCopying Files Deleting Files from the Flash Memory Displaying File ContentEnter a Directory and Determine the Current Directory What to Do After Installing the HardwareOL-23778-01 Problem Solving TroubleshootingEnvironmental Reporting Features Troubleshooting the Power and Cooling SystemsSymptom Possible Cause Corrective Action Information Packet publication Troubleshooting Cables, and ConnectionsSystem LED Reading the LEDsChassis LEDs Copper GE from Quad combo PHY ports contain Two Leds eachColor/State Description two LEDs for each T1/E1 port T1/E1 Interface LEDsSFP Ethernet Interface LEDs RJ-45 Ethernet Interface LEDsOL-23778-01 Gigabit Ethernet Connector Pinouts Cable SpecificationsPin FE Signal GE Signal SFP Port Pinouts and Cable SpecificationsT1/E1 Port Pinouts Console Port Signals and Pinouts Console Port Signals and PinoutsPin Signal Name Direction Description RJ-45-to-DB-9 Terminal Adapter Console Pin Signal Name HP Pins Direction DescriptionIdentifying a Rollover Cable Terminal Adapter Device Signal RJ-45 Pin DB-25 PinConsole RJ-45-to-DB-25 Port DTE Time of Day Pinouts Bits Port PinoutsGPS Port Pinouts 10 Mhz Alarm Port PinoutsPin Signal Name Description Management Ethernet Port PinoutsRxDP RxDN TxDP Not connected TxDN Site Log Initials DateNumerics IN-2 IN-3 IN-4
Related manuals
Manual 884 pages 9.83 Kb