Cisco Systems ASR 9014CFD, A9014CFD manual Site Log

Page 63

A P P E N D I X C

Site Log

Use the Site Log to provide a record of actions related to installing and maintaining the router. Keep it in an accessible place near the chassis so that users performing tasks have access to it. Use the Installation Checklist (see the “Installation Checklist” section on page 2-7) to verify the steps in the installation and maintenance of your router. Site Log entries might include the following:

Installation progress—Make a copy of the Cisco ASR 901 Installation Checklist, and insert it into the Site Log. Make entries as you complete each task.

Upgrade, removal, and maintenance procedures—Use the Site Log as a record of ongoing router maintenance and expansion history. Each time a task is performed on the Cisco ASR 901 router, update the site log to reflect the following:

Removal or replacement of interface modules

Configuration changes

Maintenance schedules and requirements

Maintenance procedures performed

Intermittent problems

Comments and notes

Table C-1 on page C-2shows a sample site log. Make copies of the sample or design your own site log to meet the needs of your site and equipment.

Cisco ASR 901 Series Aggregation Services Router Hardware Installation Guide

 

OL-23778-01

C-1

 

Image 63
Contents Text Part Number OL-23778-01 Americas HeadquartersPage N T E N T S Required Tools and Equipment Troubleshooting A-1 OL-23778-01 Revision Date Change Summary Document Revision HistoryConventions ObjectivesAudience OrganizationRelated Documentation Safety WarningsAbout This Guide Hardware Description IntroductionCisco ASR 901 Router Front View Cisco ASR 901 Router-Front View Cisco ASR 901 Router Ethernet Version Front ViewFan Grounding Point Lug Cisco ASR 901 Router Rear ViewLEDs Power SupplySafety Precautions Specification ValuePin Connector B Pin Connector aRouter Interface Numbering Environmental Monitoring Temperature SensorSystem Specifications Description SpecificationInterface Number Location Label Regulatory ComplianceSafety with Equipment Safety GuidelinesSafety with Electricity Preventing Electrostatic Discharge Damage Site Environment Power Supply ConsiderationsPrerequisites Site PlanningAir Flow Guidelines Method of ProcedureRequired Tools and Equipment Unpacking and Checking the Contents of your ShipmentTask Verified by Date Installation ChecklistTask Verified by Console Port ConsiderationsCreating a Site Log Console Port ConnectionsPreparing to Install the Router Console Port Considerations OL-23778-01 Network Modules Installing the Cisco ASR 901 Mobile Wireless RouterMounting the Cisco ASR 901 Router Rack-Mounting Configuration GuidelinesMounting the Cisco ASR 901 Router in a Rack Attaching the Rack-Mounting BracketsAttaching the Cable Guides Grounding the Cisco ASR 901 Router Connecting the Chassis Ground and PowerGrounding Point Stripping a Ground Wire Power Connection Compliance6-Pin Terminal Block Wiring the DC-Input Power SourceInstalling SFP Modules Installing and Removing SFP ModulesRemoving SFP Modules Installing an SFP Module into an SFP Module SlotConnecting the Console Port Connecting CablesConsole Port Types of RJ-45 CablesConnecting the Network Cables Connecting Gigabit Ethernet Interface CablesConnecting T1 and E1 Interface Cables Connecting SFP Cables Connecting Cables to the Bits InterfaceConnecting GPS Cables Dressing Router Cables Powering On the RouterConnecting to Alarm Port Connecting to the Management Ethernet PortInterpreting Front-Panel LEDs Checklist for Power UpPower-On Procedure Formatting Procedures for Flash MemoryFile and Directory Procedures Displaying Contents of the Flash MemoryCopying Files Deleting Files from the Flash Memory Displaying File ContentEnter a Directory and Determine the Current Directory What to Do After Installing the HardwareOL-23778-01 Problem Solving TroubleshootingTroubleshooting the Power and Cooling Systems Environmental Reporting FeaturesSymptom Possible Cause Corrective Action Information Packet publication Troubleshooting Cables, and ConnectionsSystem LED Reading the LEDsChassis LEDs Copper GE from Quad combo PHY ports contain Two Leds eachColor/State Description two LEDs for each T1/E1 port T1/E1 Interface LEDsSFP Ethernet Interface LEDs RJ-45 Ethernet Interface LEDsOL-23778-01 Gigabit Ethernet Connector Pinouts Cable SpecificationsSFP Port Pinouts and Cable Specifications Pin FE Signal GE SignalT1/E1 Port Pinouts Console Port Signals and Pinouts Console Port Signals and PinoutsPin Signal Name Direction Description RJ-45-to-DB-9 Terminal Adapter Console Pin Signal Name HP Pins Direction DescriptionTerminal Adapter Device Signal RJ-45 Pin DB-25 Pin Identifying a Rollover CableConsole RJ-45-to-DB-25 Port DTE Bits Port Pinouts Time of Day PinoutsGPS Port Pinouts 10 Mhz Alarm Port PinoutsPin Signal Name Description Management Ethernet Port PinoutsRxDP RxDN TxDP Not connected TxDN Site Log Initials DateNumerics IN-2 IN-3 IN-4
Related manuals
Manual 884 pages 9.83 Kb