Installing
Installing and initially configuring the switch
Installing a 2/8q FC Switch involves the following steps, each of which is discussed in the following sections:
■Unpack the switch and verify carton contents, page 28
■Mount the switch, page 29
■Install SFP transceivers, page 34
■Connect the cables, page 35
■Configure the switch, page 36
Unpack the switch and verify carton contents
The 2/8q FC Switch is shipped with the components shown in Figure 5.
2 |
1 |
3 |
4 |
7 |
6 |
5 |
12/8q FC Switch
22/8q FC Switch Quick Start Installation Instructions (printed)
3Power cable (approved for use in the United States)
4Mounting adapter brackets
5Screws for the mounting adapter brackets (6)
6Rubber feet (4)
7Small Form Factor Pluggable (SFP) transceivers (4)
Figure 5: Switch carton contents
28 | HP StorageWorks 2/8q Fibre Channel Switch Installation Guide |