HP LP 2000r manual Planning your racked system, Determine power requirements for the servers

Page 10

HP Netserver High Density Rack Solutions Overview (LP 2000r)

Planning your racked system

After you've decided what computer and networking equipment and racks you need, you're faced with the daunting task of physically locating the systems somewhere.

There are several conditions that must be met to assure that your system will work reliably and without interruptions. First, you must plan for the physical space the equipment will occupy. Second, you must ensure that the floor where the equipment will be located is strong enough to dependably support the weight. Electronic equipment, although small in size, can be physically heavy—especially Uninterruptible Power Supplies (UPS) that often use dense batteries.

Third, the system planner must calculate the power requirements and determine the number of Power Distribution Units (PDU) and UPSs needed, as well as insuring that adequate circuitry is available in the facility.

Lastly, you must insure that you can provide cooling for the equipment. Thermal requirements become a concern when mounting a mass of electronic equipment in a small physical space and a conscientious plan- ner will deal with thermal buildup in the preparation phase before the system is delivered and ready for mounting in the rack.

Many of these calculations can easily be made with the special HP Netserver Rack Configuration software available from HP for free at http://netserver.hp.com/netserver/tools/rack_asst.asp or by following these basic steps:

1List all components.

2Configure those components into racks to determine the number and size required.

Use the HP Netserver Configuration Guide, available at: http://http://netserver.hp.com/netserver/tools/, for the height of the equipment. With this aid, calculate how many devices can be installed into any one rack and its preliminary layout.

3Calculate the power requirements.

The electrical power required for a racked system must be calculated to:

1)Plan for an adequate facility supply for either 100-120V or 200-240V

2)Determine the number of Power Distribution Units needed

3)Determine the number of Uninterruptible Power Supplies required

Determine power requirements for the servers.

As mentioned above, the amount of servers that can be installed in one rack depends on a number of parameters: Physical space in the rack, electrical (power) requirements and thermal limitations.

The worksheet at the end of this section allows you to calculate the actual power consumption for your servers, including differences due to the number of processors, HDDs, and communication cards. Knowing the actual power consumption lets you design a system, which precisely meets your current— and future— requirements.

NOTE

Always plan your infrastructure for appropriate expandability and future growth.

 

 

5

Image 10
Contents Hp netserver high Density rack solutions Overview Planning your rack system for LP 2000rExecutive Summary Websites PublicationsHP Netserver website http//netserver.hp.com Reader Assumptions Table of Contents HP Netserver High Density Rack Solutions Overview LP 2000r Safety and Regulatory Information Safety WarningsGlossary HP Netserver High Density Rack Solutions Overview LP 2000r Determine power requirements for the servers Planning your racked systemCircuit breakers Power up sequencePower down sequence ServerCheck your calculations Input Power watts x 3.41=Thermal dissipation BTU/hrX 3.41 = 2,431 BTU/Hr Power consumption worksheet sample Category Part Number DescriptionPower consumption worksheet actual Gauge columns provide strength Anti-tip foot HP Rack System/EVentilation Ease of Use StrengthMobility StabilityFront doors, side panels and tie kits HP Rack AccessoriesFor Use with HP Rack Model Number Content For Use with HP Rack Model NumberUse Tie Kit Kit Contains HP Rack System/E Cable Management AccessoryMount Fastener Voltage Current Outlets HP Product Number Type HP Power Distribution OptionsE7675A E77671A E7676A HP Netserver High Density Rack Solutions Overview LP 2000r Uninterruptible Power Supplies UPS Power = Vol ts x AmpsDescription Includes Console SwitchAvailable Kit Contains HP Model Number HP Rackmount Flat Panel Monitor and KeyboardHP Rack System/E Vertical Extension Kit HP Vertical Extension Kit IncludesPost HP System/E racks or EIA standard cabinets InstallationFlexible installation options Slide mountingMarking the rack Marking Rack ColumnsFixed, center mounting Post EIA standard non-HP racks 3 optionsFixed, flush mounting Marking the Rack Location Marks on the Racks Front ColumnsBefore you begin installation Preparing the HP Netserver for 2-post rack installationInstalling Power Distribution Units Installing the Uninterruptible Power SuppliesInstalling the servers PDUs can be mounted on the rearAttach the Cable Management Arm Cable ManagementHP System/E racks Attach the main cable guidesSecure each cable bundle Begin routing the cablesRoute the cables to their destination Maintain the ambient temperature Conclusion HP Netserver High Density Rack Solutions Overview LP 2000r