HP AA-RSB6B-TE manual Grounding Methods

Page 84

Electrostatic Discharge

Grounding Methods

There are several methods for grounding. Use one or more of the following methods when handling or installing electrostatic-sensitive parts:

Use a wrist strap connected by a ground cord to a grounded workstation or

computer chassis. Wrist straps are flexible straps with a minimum of 1 megohm ± 10 percent resistance in the ground cords. To provide proper ground, wear the strap snug against the skin.

Use heel straps, toe straps, or boot straps at standing workstations. Wear the straps on both feet when standing on conductive floors or dissipating floor mats.

Use conductive field service tools.

Use a portable field service kit with a folding static-dissipating work mat.

If you do not have any of the suggested equipment for proper grounding, have an HP authorized reseller install the part.

84

hp StorageWorks SAN Switch 2/8 Installation Guide

Image 84
Contents Hp StorageWorks SAN switch 2/8 Page Contents Contents Regulatory Compliance Notices Technical Specifications Electrostatic DischargeTables Contents Contents About this Guide Overview Intended AudienceRelated Documentation Text Symbols ConventionsDocument Conventions Equipment Symbols About this Guide Rack Stability Rack stability protects personal and equipmentGetting Help HP Technical SupportHP Storage Website HP Authorized Reseller Overview1 SAN Switch 2/8 Features FirmwareHardware SFP Media Side Fan Side Accessory Part Number Optional Hardware KitsOverview Installing SAN Switch 2/8 Check the License Installed Four Switch Limitation ErrorsFour Switch Limitation CLI Error Messages Violation Timer Errors Four Switch Limitation Workarounds Unpack and Verify Carton Contents Number Description Installation and Safety Guidelines Selecting an Operating LocationCooling Requirements Power Requirements Installing the Switch as a Stand-alone Unit Installing the Fixed Rail Kit Attaching the Fixed Rack Mount Kit rails to the switch Connecting the power cord Optional HP System/e Rack Items Required for the HP System/e RackInstalling the SAN Switch 2/8 Installing the Switch in the Optional HP System/e Rack Installing the rear rail tray brackets Installing the tinnerman clips Installing the rubber washers Assembling the outer rails Assembling the inner rails Installing the switch into an HP Rack Securing the switch Power On Self-Test Configuring SAN Switch 2/8 Network Addressing Setting Network Addresses via a Serial ConnectionRequirements Connecting the Serial cable To configure port settings in a Unix environment, type Connecting the SAN Switch 2/8 to the LAN Connecting the Ethernet cableImportant Information on Setting the Core PID Format How to Check the Current Core PID SettingHow to Change the Core PID Format Modifying Domain IDs Specifying Custom Status Policies Connecting a Cable to an SFP Module Verifying Operation Inserting a cable into an SFPInstalling Multiple Switches into an Existing SAN Cascading Switches Managing SAN Switch 2/8 Interpreting LED Activity Front Panel LEDsLED Port Speed Ethernet Link Rear Panel LED Management Overview Displaying the Optional Feature Licenses Enabling Licensed FeaturesRunning Basic Switch Operations Using Telnet Logging into the SAN Switch 2/8Changing the Admin Password and User ID Configuring the IP and Fibre Channel Address Setting the Switch Date and Time Displaying Devices within the FabricChecking the Firmware Version SAN Switch 2/8 Diagnostic Tests Displaying Switch Configuration SettingsInterpreting Post Results Diagnostic Tests Managing the SAN Switch 2/8 Saving Configuration Settings Upgrading Firmware Backing Up System Configuration Settings Restoring the System Configuration Settings FastBootUpgrading or Restoring the Switch Firmware Downloading Firmware from the HP WebsiteRegulatory Compliance Notices FCC EMC Statement USAEMC Statement Canada EMC Statement European UnionSpécification ATI Classe a France Germany Noise DeclarationRegulatory Compliance Notices Laser Safety Certification and Classification InformationBattery Replacement Notice Regulatory Compliance Notices Electrostatic Discharge Grounding Methods Technical Specifications Dimensions Power Supply SpecificationsMemory Specifications Environmental RequirementsSerial Port Specifications PINAlpa APIAsic ATMAwtov BERCRC DLSEdtov FC-AL-3 FC-FLAFcia FCPFlogi FsaccHBA ISLLIP MIBNAA Plogi Post RatovRrtov RscnRxid SANSwitch Translative ModeTarget TenancyUDP UlptovULP WWNIndex Network addressing Hp StorageWorks SAN Switch 2/8 Installation Guide 103 104