Cable requirements
NOTE:
Optical cables for the Edge Switch 2/12, Edge Switch 2/12, and Edge Switch 2/32 must be ordered separately.
For cables measuring up to 500 meters (1 Gbps) or 300 meters (2 Gbps), use
aswitch.
Verify that connectors interfacing with the Edge Switch 2/12, Edge Switch 2/24, and Edge Switch 2/32 use LC Duplex connectors with a PC finish. In addition, the connector at the opposite end of the cable must be of either LC or SC type, depending on the requirements of the connected device.
Important information
This section describes important information related to the Edge Switch 2/12, Edge Switch 2/24, and Edge Switch 2/32.
Minor Code Enhancements and Fixes in fw 07.01.02-4
This release of firmware version
Directors take new action upon detecting a failed UPM port module
A particular type of failure in director UPM port modules could be disruptive to other port modules in a director. In the release of firmware
Embedded Web Server zoneset activation timeout issue resolved
Under certain conditions, the Embedded Web Server (EWS) would sometimes not allow the Zone Manager subsystem enough time to process a configuration change request. This would cause EWS to time out when waiting for the Zone Manager to respond. When this occurred, the Zone Manager could hang indefinitely, preventing any further zone activities from any management location. This timeout issue has been fixed.
Edge Switch release notes | 5 |