HP Performance Optimized Data Center (POD) 40cp manual System utilities, Power, Description

Page 5

You have chilled water at your final location.

You have made provisions for properly grounding the HP POD.

System utilities

Your site location must accommodate the following utilities:

Cooling water

Electrical power ("Power" on page 5)

Drainage (on page 6)

Power

Item

Description

 

 

1

Main input power junction box

 

 

2

Chilled water return connection

 

 

3

Chilled water supply connection

 

 

4

IT cable portals

 

 

Site requirements 5

Image 5
Contents Part Number March 2010 Second Edition Intended audience Contents Site requirements Safety informationAbout this document Site preparationDescription PowerSystem utilities Optional connections to central facility infrastructure Environmental specificationsDrainage Environmental considerationsLightning protection Dimensions HP POD specificationsWeight External cold aisle viewTop view Required clearancesDouble door end view Callout Feature Water input side view Callout FeatureExternal hot aisle view Water supply specificationsFeature Specification Water quality requirements Water quality requirements and specificationsAcceptable water quality specifications Piping materials Water precautionsCondensation management Power requirements Power managementConnection requirements Standard density HP PODComponent Quantity Phases Amps Volts Description Standard density HP POD with redundant powerHigh density HP POD High density HP POD with redundant powerHP POD control power Supported facility connections Humidifier specificationsConvenience outlets Grounding requirementsHP POD Environmental Control System IT cable portalsHP POD security EPO Fire, safety, and security notificationsAcronyms and abbreviations