HP Performance Optimized Data Center (POD) 40cp manual Required clearances, Top view

Page 9

Item

Component

 

 

4

Fan control panel

 

 

5

Redundant relay panel

 

 

6

House panels

 

 

7

Main input power junction boxes

 

 

8

Security panel

 

 

9

Humidifier (optional)

 

 

10

EPO button

 

 

11

ASSD panel

 

 

12

Fire alarm XFMR

 

 

13

Fire alarm control panel

 

 

14

EPO panel

 

 

The middle 225A busway circuit breakers are present in the high density HP POD only.

Required clearances

NOTE: Shaded areas indicate required clearances.

Top view

HP POD specifications 9

Image 9
Contents Part Number March 2010 Second Edition Intended audience Contents Site requirements Safety informationAbout this document Site preparationPower System utilitiesDescription Optional connections to central facility infrastructure Environmental specificationsDrainage Environmental considerationsLightning protection Dimensions HP POD specificationsWeight External cold aisle viewTop view Required clearancesDouble door end view Callout Feature Water input side view Callout FeatureWater supply specifications Feature SpecificationExternal hot aisle view Water quality requirements and specifications Acceptable water quality specificationsWater quality requirements Water precautions Condensation managementPiping materials Power requirements Power managementConnection requirements Standard density HP PODComponent Quantity Phases Amps Volts Description Standard density HP POD with redundant powerHigh density HP POD High density HP POD with redundant powerHP POD control power Supported facility connections Humidifier specificationsConvenience outlets Grounding requirementsIT cable portals HP POD securityHP POD Environmental Control System EPO Fire, safety, and security notificationsAcronyms and abbreviations
Related manuals
Manual 63 pages 13.75 Kb Manual 79 pages 43.3 Kb