Sterling STT 110, STT 160 Transport, Assembly and Storage, Assembly instructions, Technical Data

Page 5

STT 110 / STT 160

6.1. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2 6.2. Drying Hopper (Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5 6.2.1. Hopper Heater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6 6.3. Connection to a Pneumatic Conveying System (Optional) . . . . . . . . . . . . . . . . 6-7

6.4. Return Air Cooler (Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7

7. Transport, Assembly and Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1

7.1. Tansport and Packing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2

7.2. Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3

7.3. Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3

8. Assembly instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1

8.1. Installation of the exhauster fan for regeneration of exhaust air. . . . . . . . . . . . 8-2 8.2. Grounding the equipment against electrostatic charging . . . . . . . . . . . . . . . . . 8-2 8.3. Electrical Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3 8.4. Connection of Return Air Cooler (Optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4

9. Technical Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1

9.1. STT 110. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1 9.2. STT 160. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2 9.3. Dimension Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3

10. Spare parts list . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1

11. Electrical manual. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1

oConnection diagram no.: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

oCurrently not available; will be delivered at a later date !

12. Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1

oBasic setting thermo regulator

oDigital timer

o_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

o_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

o_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

SM2-605

5

Image 5
Contents Sterling Material Processing Operating Instructions Dehumidified air dryer STTEdition 04/02 STT 110 / STT Sterling Material ProcessingSTT 110 / STT Table of contents Assembly instructions Transport, Assembly and StorageTechnical Data Spare parts list Electrical manualGeneral Information General InformationSTT 110 / STT STT 110 / STT Fields of applications CTT 110 / CTT Explanations and informationLegal basis Safety instructions Safety instructionsGeneral STT 110 / STT For your safetyOperation AssemblyMaintenance STT 110 / STT For the safety of the devices Start up Start upFor operation with timer clock optional Switching on the DryerFor operation without timer clock STT 110 / STT Initial OperationExit STT 110 / STT Continuous Operation Switching the Dryer onSTT 110 / STT Setting the Drying Temperature Optimizing the thermo regulator ExitSTT 110 / STT Switching the Dryer off Error and error correction Error and error correctionHopper heater Following errors can lead to an alarm BlowerRegeneration heater Maintenance MaintenanceSTT 110 / STT STT 110 / STT Maintenance schedule STT 110 / STT Cleaning or Replacing the Air Filter STT 110 / STT STT 110 / STT Cleaning or Replacing the Return Air FilterSTT 110 / STT Disposing of Drying Agents STT 110 / STT Cleaning the Drying Hopper STT 110 / STT ST 60 ST Functional description Functional descriptionSTT 110 / STT General Information STT 110 / STT STT 110 / STT STT 110 / STT Drying Hopper Optional STT 110 / STT Hopper Heater 180Return Air Cooler Optional Transport, Assembly and Storage Transport, Assembly and StorageSTT 110 / STT Tansport and Packing Storage STT 110 / STT AssemblyAssembly instructions Assembly instructionsGrounding the equipment against electrostatic charging STT 110 / STT Electrical Connection STT 110 / STT Connection of Return Air Cooler Optional Technical Data Technical DataSTT Return Air CoolerSTT 110 / STT STT 110 / STT Dimension Sheet Spare parts list Spare parts listDescription STT 110 / STT Pos ID-numberReturn air cooler optional Operating unit Pos ID-number Description Control unit Electrical manual Electrical manualAccessories AccessoriesParameter Parameter set Basic setting thermo regulatorCode
Related manuals
Manual 58 pages 20.61 Kb