Sterling STT 110, STT 160 manual Assembly instructions

Page 43

STT 110 / STT 160

8. Assembly instructions

»

L

These installation instructions are intended for persons with skills in electri- cal and mechanical areas due to their training, experience and received in- structions.

Personnel using these installation instructions must be instructed in the reg- ulations for the prevention of accidents, the operating conditions and safety regulations and their implementation.

Ensure in each case that the personnel are informed.

The installation instructions provided in the corresponding operating instruc- tions apply for all connected equipment.

Observe safety regulations with regard to lifting gear handling.

All installation work must be carried out with the equipment disconnected from electrical power and compressed air supply.

For installation work taking place at heights of over approx. 6 feet (1829 mm), use only ladders or similar equipment and working platforms in- tended for this purpose. At greater heights, the proper equipment for pro- tection against falling must be worn.

Use only suitable lifting gear which is in proper working order and load suspension devices with sufficient carrying capacity. Do not stand or work under suspended loads!

Use suitable workshop equipment.

F

Install the equipment such that all parts are easily accessible; this facili- tates maintenance and repair work

SM2-605

Assembly instructions 8-1

Image 43
Contents Sterling Material Processing Operating Instructions Dehumidified air dryer STTEdition 04/02 STT 110 / STT Sterling Material ProcessingSTT 110 / STT Table of contents Spare parts list Electrical manual Transport, Assembly and StorageAssembly instructions Technical DataGeneral Information General InformationSTT 110 / STT STT 110 / STT Legal basis CTT 110 / CTT Explanations and informationFields of applications Safety instructions Safety instructionsGeneral STT 110 / STT For your safetyOperation AssemblyMaintenance STT 110 / STT For the safety of the devices Start up Start upSTT 110 / STT Initial Operation Switching on the DryerFor operation with timer clock optional For operation without timer clockExit STT 110 / STT Continuous Operation Switching the Dryer onSTT 110 / STT Setting the Drying Temperature Optimizing the thermo regulator ExitSTT 110 / STT Switching the Dryer off Error and error correction Error and error correctionRegeneration heater Following errors can lead to an alarm BlowerHopper heater Maintenance MaintenanceSTT 110 / STT STT 110 / STT Maintenance schedule STT 110 / STT Cleaning or Replacing the Air Filter STT 110 / STT STT 110 / STT Cleaning or Replacing the Return Air FilterSTT 110 / STT Disposing of Drying Agents STT 110 / STT Cleaning the Drying Hopper STT 110 / STT ST 60 ST Functional description Functional descriptionSTT 110 / STT General Information STT 110 / STT STT 110 / STT STT 110 / STT Drying Hopper Optional STT 110 / STT Hopper Heater 180Return Air Cooler Optional Transport, Assembly and Storage Transport, Assembly and StorageSTT 110 / STT Tansport and Packing Storage STT 110 / STT AssemblyAssembly instructions Assembly instructionsGrounding the equipment against electrostatic charging STT 110 / STT Electrical Connection STT 110 / STT Connection of Return Air Cooler Optional Return Air Cooler Technical DataTechnical Data STTSTT 110 / STT STT 110 / STT Dimension Sheet Spare parts list Spare parts listDescription STT 110 / STT Pos ID-numberReturn air cooler optional Operating unit Pos ID-number Description Control unit Electrical manual Electrical manualAccessories AccessoriesCode Basic setting thermo regulatorParameter Parameter set
Related manuals
Manual 58 pages 20.61 Kb