Sterling STT 160 manual STT 110 / STT Initial Operation, Switching on the Dryer

Page 16

SM2-605

STT 110 / STT 160

3.1. Initial Operation

Check whether the inlet of the drying hopper is closed by a blind lid, or whether a conveyor unit (optional) is installed.

If not, manufacture a suitable blind lid and install it on the inlet of the drying hopper or install the conveyor unit (optional).

F

Attachments which are not supplied by Sterling must be manufactured

according to the safety regulation European Standard 294.

Check whether the coolant circuit of the return air cooler is turned on (if a return air cooler is instal- led).

3.1.1. Switching on the Dryer

Switch on the main switch of the dryer.

&

The signal lamp “power” goes on.

 

 

For operation with timer clock (optional):

Turn the release switch “Timer” at position:

For operation without timer clock:

Turn the release switch “Timer” at position:

&

The blower is running.

 

 

F

If the dryer has not been in use for several months it must be operated for

about 2 hours without material.

Start up 3-2

Image 16
Contents Operating Instructions Dehumidified air dryer STT Sterling Material ProcessingSTT 110 / STT Sterling Material Processing Edition 04/02STT 110 / STT Table of contents Transport, Assembly and Storage Assembly instructionsTechnical Data Spare parts list Electrical manualGeneral Information General InformationSTT 110 / STT STT 110 / STT Legal basis CTT 110 / CTT Explanations and informationFields of applications Safety instructions Safety instructionsSTT 110 / STT For your safety GeneralAssembly OperationMaintenance STT 110 / STT For the safety of the devices Start up Start upSwitching on the Dryer For operation with timer clock optionalFor operation without timer clock STT 110 / STT Initial OperationExit Switching the Dryer on STT 110 / STT Continuous OperationSTT 110 / STT Setting the Drying Temperature Exit Optimizing the thermo regulatorSTT 110 / STT Switching the Dryer off Error and error correction Error and error correctionRegeneration heater Following errors can lead to an alarm BlowerHopper heater Maintenance MaintenanceSTT 110 / STT STT 110 / STT Maintenance schedule STT 110 / STT Cleaning or Replacing the Air Filter STT 110 / STT Cleaning or Replacing the Return Air Filter STT 110 / STTSTT 110 / STT Disposing of Drying Agents STT 110 / STT Cleaning the Drying Hopper STT 110 / STT ST 60 ST Functional description Functional descriptionSTT 110 / STT General Information STT 110 / STT STT 110 / STT STT 110 / STT Drying Hopper Optional 180 STT 110 / STT Hopper HeaterReturn Air Cooler Optional Transport, Assembly and Storage Transport, Assembly and StorageSTT 110 / STT Tansport and Packing STT 110 / STT Assembly StorageAssembly instructions Assembly instructionsGrounding the equipment against electrostatic charging STT 110 / STT Electrical Connection STT 110 / STT Connection of Return Air Cooler Optional Technical Data Technical DataSTT Return Air CoolerSTT 110 / STT STT 110 / STT Dimension Sheet Spare parts list Spare parts listSTT 110 / STT Pos ID-number DescriptionReturn air cooler optional Operating unit Pos ID-number Description Control unit Electrical manual Electrical manualAccessories AccessoriesCode Basic setting thermo regulatorParameter Parameter set