Sterling STT 110 CTT 110 / CTT Explanations and information, Legal basis, Fields of applications

Page 9

SM2-605

CTT 110 / CTT 160

1.2. Explanations and information

Various terms and designations are used in these operating instructions to ensure clarity. There- fore please note that the terms used in the text stand for the corresponding explanations listed be- low.

Equipment

”Equipment” can mean an individual unit, a machine or an installation.

Operating personnel

The ”operating personnel” are persons operating the equipment on their own responsibility or ac- cording to instructions.

Operator

The ”operator” of the equipment (production manager, foreman, etc.) is the person responsible for all production sequences. The operator instructs the operating personnel of what is to be done.

Operating instructions

The ”operating instructions” describe the interaction of the equipment, production sequences or methods. The operating instructions must be compiled by the operator of the equipment.

Equipment foreman

When several operating personnel work on one machine, the ”equipment foreman” coordinates the sequences. The equipment foreman must be appointed by the operator.

Trained personnel

”Trained personnel” are persons who, due to their training, are authorized to carry out the required work.

1.3. Legal basis

See “Manufacturer’s Certificate” resp. “Certificate of Conformity”.

1.4. Fields of applications

For the drying of thermoplastic granules and regrind before processing in order to remove all re- maining moisture from the granules both inside and out, independent of climate or ambient air conditions.

1.5. Notes on Usage

Experienced operators can begin directly with the chapter on “Start-up” if the unit has been pro- perly installed.

If the unit has not been installed yet, observe the instructions in the chapter on “Assembly Instruc- tions” and “Transport, Assembly and Storage”.

General Information 1-4

Image 9
Contents Sterling Material Processing Operating Instructions Dehumidified air dryer STTEdition 04/02 STT 110 / STT Sterling Material ProcessingSTT 110 / STT Table of contents Assembly instructions Transport, Assembly and StorageTechnical Data Spare parts list Electrical manualGeneral Information General InformationSTT 110 / STT STT 110 / STT CTT 110 / CTT Explanations and information Legal basisFields of applications Safety instructions Safety instructionsGeneral STT 110 / STT For your safetyOperation AssemblyMaintenance STT 110 / STT For the safety of the devices Start up Start upFor operation with timer clock optional Switching on the DryerFor operation without timer clock STT 110 / STT Initial OperationExit STT 110 / STT Continuous Operation Switching the Dryer onSTT 110 / STT Setting the Drying Temperature Optimizing the thermo regulator ExitSTT 110 / STT Switching the Dryer off Error and error correction Error and error correctionFollowing errors can lead to an alarm Blower Regeneration heaterHopper heater Maintenance MaintenanceSTT 110 / STT STT 110 / STT Maintenance schedule STT 110 / STT Cleaning or Replacing the Air Filter STT 110 / STT STT 110 / STT Cleaning or Replacing the Return Air FilterSTT 110 / STT Disposing of Drying Agents STT 110 / STT Cleaning the Drying Hopper STT 110 / STT ST 60 ST Functional description Functional descriptionSTT 110 / STT General Information STT 110 / STT STT 110 / STT STT 110 / STT Drying Hopper Optional STT 110 / STT Hopper Heater 180Return Air Cooler Optional Transport, Assembly and Storage Transport, Assembly and StorageSTT 110 / STT Tansport and Packing Storage STT 110 / STT AssemblyAssembly instructions Assembly instructionsGrounding the equipment against electrostatic charging STT 110 / STT Electrical Connection STT 110 / STT Connection of Return Air Cooler Optional Technical Data Technical DataSTT Return Air CoolerSTT 110 / STT STT 110 / STT Dimension Sheet Spare parts list Spare parts listDescription STT 110 / STT Pos ID-numberReturn air cooler optional Operating unit Pos ID-number Description Control unit Electrical manual Electrical manualAccessories AccessoriesBasic setting thermo regulator CodeParameter Parameter set
Related manuals
Manual 58 pages 20.61 Kb