York GM9S*DH, GY9S*DH, GF9S*DH Combustion AIR/VENT Pipe Sizing, Model Input Pipe Size Maximum

Page 15

268890-UIM-B-0607

This furnace may not be common vented with any other appliance, since it requires separate, properly sized air intake and vent lines. The furnace shall not be connected to any type of B, BW or L vent or vent connector, and not connected to any portion of a factory- built or masonry chimney

The furnace shall not be connected to a chimney flue serving a sep- arate appliance designed to burn solid fuel.

When combustion air pipe is installed above a suspended ceiling or when it passes through a warm and humid space, the pipe must be insulated with 1/2” Armaflex or other heat resistant type insulation.

Vent piping must be insulated with 1/2” insulation if it will be sub- jected to freezing temperatures such as routing through unheated areas or through an unused chimney.

COMBUSTION AIR/VENT PIPE SIZING

The size of pipe required will be determined by the furnace model, the total length of pipe required and the number of elbows required.

Table 8 lists the maximum equivalent length of pipe allowed for each model of furnace. The equivalent length of elbows is shown in Table 9. The equivalent length of the vent system is the total length of straight pipe PLUS the equivalent length of all of the elbows.

The following rules must also be followed:

1.Long radius (sweep) elbows are recommended. Standard elbows may be used, but since they have a longer equivalent length, they will reduce the total length of pipe that will be allowed. Short radius (plumbing vent) elbows are not allowed. The standard dimensions of the acceptable elbows are shown below.

2.The maximum equivalent length listed in Table 8 is for the vent pip- ing and the air intake piping separately. For example, if the table allows 65 equivalent feet for a particular model, then the vent can have 65 equivalent feet of pipe, AND the combustion air intake can have another 65 equivalent feet of pipe.

3.Three vent terminal elbows (two for the vent and one for the com- bustion air intake) are already accounted for and need not be included in the equivalent length calculation.

4.All combustion air and vent pipe must conform to American National Standards Institute (ANSI) and American Society for Test- ing and Materials (ASTM) standards D1785 (Schedule 40 PVC), D2665 (PVC-DWV), F891 (PVC-DWV Cellular Core), D2261 (ABS-DWV) or F628 (Schedule 40 ABS). Pipe cement and primer must conform to ASTM Standard D2546 (PVC) or D2235 (ABS). If ABS pipe is to be used, any joint where ABS pipe is joined to PVC pipe must be glued with cement that is approved for use with BOTH materials. Metallic materials must not be used for venting or air intake.

5.If a flexible connector is used in the vent system, it must be made of a material that is resistant to acidic exposure and to at least 225° F temperature. Flexible connectors are also allowed in the combustion air pipe.

6.All models are supplied with 2" vent connections. When the pipe must be increased to 3" diameter, the transition from 2" to 3" must be done as close to the furnace as possible. For upflow models, the transition from 2" to 3" should be done immediately above the furnace. For downflow or horizontal models, the transition from 2" to 3" pipe should be done immediately after the drain tee or drain elbow.

7.In Canada, vents shall be certified to ULC S636, Standard for Type BH Gas Venting Systems. IPEX System 636 PVC is certified to this standard.

8.In Canada, the first three feet (900 mm) of the vent must be readily accessible for inspection.

TABLE 8: Maximum Equivalent Pipe Length

Model Input

 

 

Pipe Size

 

Maximum

 

 

 

Equivalent

BTUH (kW)

 

Inches (cm)

 

 

 

length feet (m)

 

 

 

 

 

 

 

 

 

 

 

 

 

40,000 (11.7)

 

 

2 (5.1)

 

65 (19.8)

40,000 (11.7)

 

 

3 (7.6)

 

90 (27.4)

60,000 (17.6)

 

 

2 (5.1)

 

65 (19.8)

60,000 (17.6)

 

 

3 (7.6)

 

90 (27.4)

80,000 (23.4)

 

 

2 (5.1)

 

65 (19.8)

80,000 (23.4)

 

 

3 (7.6)

 

90 (27.4)

100,000 (29.3)

 

 

2 (5.1)

 

30 (9.2)

100,000 (29.3)

 

 

3 (7.6)

 

85 (25.9)

120,000 (29.3)

 

 

3 (7.6)

 

60 (18.3)

TABLE 9: Equivalent Length of Fittings

 

 

 

 

 

 

 

Fitting

 

 

 

Equivalent Length

 

 

 

 

 

2" 90º sweep elbow

 

 

 

5 feet of 2" pipe

2" 45º sweep elbow

 

 

 

2-1/2 feet of 2" pipe

2" 90º standard elbow

 

 

 

10 feet of 2" pipe

2" 45º standard elbow

 

 

 

5 feet of 2" pipe

3" 90º sweep elbow

 

 

 

5 feet of 3" pipe

3" 45º sweep elbow

 

 

 

2-1/2 feet of 3" pipe

3" 90º standard elbow

 

 

 

10 feet of 3" pipe

3" 45º standard elbow

 

 

 

5 feet of 3" pipe

2" corrugated connector

 

 

10 feet of 2" pipe

3" corrugated connector

 

 

10 feet of 3" pipe

Example:

An 80,000 BTUH furnace requires 32 feet of pipe and four 90º elbows. Using 2" pipe and standard elbows, the total equivalent length will be:

32 feet of 2" pipe =

32 equivalent feet

4 - 90º standard 2" elbows = (4x10) =

40 equivalent feet

Total =

72 equivalent feet of 2" pipe

This exceeds the 65 foot maximum equivalent length of 2" pipe allowed for that model and is thus not acceptable.

By using sweep elbows, the total equivalent length will be:

32 feet of 2" pipe =

32 equivalent feet

4 - 90º standard 2" elbows = (4x5) =

20 equivalent feet

Total =

52 equivalent feet of 2" pipe

This is less than the 65 foot maximum equivalent length of 2" pipe allowed for that model and is thus acceptable.

Alternatively, using 3" pipe and standard elbows, the total equivalent length will be:

32 feet of 3" pipe =

32 equivalent feet

4 - 90º standard 2" elbows = (4x5) =

40 equivalent feet

Total =

72 equivalent feet of 3" pipe

This is less than the 90 foot maximum equivalent length of 3" pipe allowed for that model and is thus acceptable.

Unitary Products Group

15

Image 15
Contents List of Tables Section I SafetyList of Sections List of FiguresCombustion AIR Quality List of Contaminants Specific Safety Rules and PrecautionsSafety Requirements Ance to a 50 HZ Power Supply or a Voltage Above 130 VoltsInspection Furnace Location and ClearancesDirectly BELOW. Keep Clear of ALL OBSTRUC- Tions Ductwork General Information Floor Base and Ductwork InstallationDuctwork Installation Section II DuctworkInput Return1 Rectangular2 Round2 Supply3Round Duct Size Horizontal Models Horizontal Installations With a Cooling Coil CabinetHorizontal Installations Without a Cooling Coil Cabinet Downflow Air Conditioning Coil CabinetFilter Installation Section III FiltersCFM Horizontal Application Attic InstallationSuspended Furnace / Crawl Space Installation Downflow FiltersSection IV GAS Piping Section V Electrical Power Electrical Power ConnectionsAfue Supply Voltage Connections LOW Voltage Control Wiring ConnectionsAC1 Section VI Twinning and Staging Combustion AIR and Vent Safety Section VII Combustion AIR and Vent SystemStaging Model Input Pipe Size Maximum Combustion AIR/VENT Pipe SizingFurnace Vent Connection Sizes Combustion AIR and Vent Piping AssemblyElbow Dimension Combustion AIR / Vent ClearancesHome Layout Vent ClearancesHorizontal Vent Applications and Termination Downflow Vent AssemblyHorizontal Vent Assembly Vent SystemOutdoor Combustion Air Vertical Vent Applications TerminationVenting Multiple Units Combustion AIR SupplyBtuh Ambient Combustion Air SupplyCombustion Air Source From Outdoors Dampers, Louvers and Grilles Canada OnlyVent and Supply Outside Air Safety Check Procedure Ventilated Combustion AirVentilated Combustion Air Termination Condensate Drain Hose Part Numbers Section Viii Condensate PipingCondensate Drain Condensate Drain Trap and Drain Freeze ProtectionHorizontal Left Air Flow Inducer Low Refer to Figures 31 Hose #5 Hose #1Hose #9 Hose #4 Hose #6 Horizontal Right Air Flow Inducer High Refer to Figures Unitary Products Group HOSE#1 Hose #2 Barbed TEE Hose #4 Hose #7 Hose #9 Section X START-UP Adjustments Section IX Safety ControlsCalculating the Furnace Input Natural GAS Ignition System SequenceUSA use the following formula to calculate the furnace input Reading the gas pressure with the burner box cover in place Adjustment of Manifold GAS PressureInlet GAS Pressure Range Nominal Manifold PressureWith Burner BOX Cover Removed Adjustment of Temperature RiseAdjustment of FAN Control Settings With Burner BOX Cover in PlaceIgnition Control Furnace Control DiagnosticsDiagnostic Fault Code Storage and Retrieval Slow Green Flash Normal operationPleated Filter PerformanceModels Airflow Range Minimum Filter Type Opening Size DisposableField Installed Accessories NON-ELECTRICAL Applying Filter Pressure Drop to Determine System AirflowModel no Description Used with Section XI Wiring Diagram Unitary 5005 Norman Product York Group Drive 73069

GF9S*DH, GY9S*DH, GM9S*DH specifications

The York GM9S*DH, GF9S*DH, and GY9S*DH series air conditioning systems are known for their robust performance, reliability, and energy efficiency. These models are well-suited for both residential and light commercial applications, making them versatile options for a range of users.

One of the standout features of these systems is their high efficiency. The GM9S*DH is equipped with advanced heating and cooling technologies that allow it to achieve excellent SEER (Seasonal Energy Efficiency Ratio) ratings. This translates to lower energy consumption and reduced utility bills for homeowners and business operators alike. The GF9S*DH model further enhances this efficiency by incorporating variable-speed blowers that adjust airflow based on specific needs, ensuring that the system operates only as necessary.

Reliability is another key characteristic of the York GM9S*DH, GF9S*DH, and GY9S*DH series. These models are engineered with durable components and rigorous performance testing, which contributes to their long lifespan and minimizes the need for repairs. Moreover, they come with robust warranties that provide peace of mind for consumers.

In terms of technology, these units utilize a smart thermostat feature that allows for precise temperature control and programmable settings. This feature not only enhances comfort but also contributes to energy savings by allowing users to set optimal cooling or heating schedules. The systems are also designed with quiet operation in mind, employing sound-dampening features that minimize noise levels, which is particularly beneficial for residential installations.

The installation of the York GM9S*DH, GF9S*DH, and GY9S*DH systems is straightforward, offering flexibility in placement and integration with various home or office setups. Their compact design allows them to fit seamlessly into different environments without compromising on performance.

Additionally, the systems are equipped with advanced filtration options that improve indoor air quality by capturing allergens and pollutants. This is particularly beneficial for families with children or members who suffer from allergies.

Overall, the York GM9S*DH, GF9S*DH, and GY9S*DH series provide exceptional performance, energy efficiency, and reliability, making them an ideal choice for maintaining a comfortable indoor environment. With their cutting-edge technologies and user-friendly features, these systems represent an excellent investment for anyone looking to enhance their heating and cooling experience.