Installation
1.Assemble the base (5) as shown in FIG. 4. Place an opened
2.For 246903, cut the extension tube (P) at a 45° angle to a length appropriate for the size of the
F
3b
DR 3d
drum. When installed, the bottom of the angle should be about 1” (25 mm) from the bottom of the drum. The down tube for 225728 is sized for the container.
3.Set the cover (4) on the drum and secure the thumbscrews (Q). Install the pump (F) on the cover
(4) with the screws (R), washers and nuts (S) pro- vided
4.Connect the hose (2a) to the pump fluid outlet (N).
2a
3d
N
2b
3a
4
3c | S |
|
Q
P
5
FIG. 4
Installation and Operation | 9 |