Graco 225 important safety instructions Installation

Models: 225

1 34
Download 34 pages 61.29 Kb
Page 11
Image 11

55-Gallon (208 Liter) Drum Cover Pump

Fire-Ball 225 Model 246906

Fire-Ball 300 Model 225642

Fire-Ball 425 Model 225782

1.For 246906 cut the extension tube (P) at a 45° angle to a length appropriate for the size of the drum. When installed, the bottom of the angle should be about 1” (25 mm) from the bottom of the drum. For 225642 and 225782 the down tube is sized for the container.

2.Set the cover (4) on a 55-gallon (208 liter) drum. Install the pump (F) on the cover with the screws (R) supplied. See FIG. 6

F

3d D

3b

3d

3c

2d

3a

2c

4

Installation

3.Assemble the air regulator kit (items 3a-3d) to the pump air inlet (D) as shown. Use thread sealant and tighten all parts securely.

4.Apply thread sealant to the male threads of the 3/8 npt swivel union (2d). Screw the union into the bleed-type master air valve (3c).

5.Apply thread sealant to the male threads of the 1/2 npt swivel union (2b). Screw the union into the pump fluid outlet (N).

6.Connect the 1/2 npt(mbe) fluid hose (2a) to the swivel union (2b).

7.Connect the 3/8 npt(mbe) air hose (2c) to the swivel union (2d).

R

2b

N

2a

P

FIG. 6

Installation and Operation

11

Page 11
Image 11
Graco 225 important safety instructions Installation