United States Stove 4027, ASA7 owner manual Detail Connection

Page 11

FIGURE 7 -

EXTERIORLY INSTALLED METAL PREFABRICATED CHIMNEY THAT RUNS UP THE OUTSIDE OF THE RESIDENCE.

STORM COLLAR

MAINTAIN 2 INCH CLEAR-

ANCE THROUGH EAVE

CEILING

CHIMNEY

CONNECTOR

TO

HEATER

FLOOR

PROTECTOR

SECTION LISTED

CHIMNEY PIPE

TO HEATER

CHIMNEY

CONNECTOR

TRIM COLLAR

ON INSIDE WALL

CHIMNEY CAP

(WITH SPARK ARRESTER IF DESIRED OR WHERE REQUIRED BY LAW.)

ROOF FLASHING

INSULATED "T"

WALL

COMBUSTIBLE OUTSIDE WALL

2" CLEARANCE

(BETWEEN WALL

AND CHIMNEY)

LISTED CHIMNEY

INSULATED "T"

WALL SUPPORT

WALL SPACER

ON OUTSIDE WALL

DETAIL OF

CONNECTION

USSC

11

Image 11
Contents Owner’s Manual Materials Needed for Proper Installation Safety PrecautionsSafety Standards and Building Codes Feed & Ash Door Assemblies AssemblyShaker Handle Assembly Flue Collar AssemblyRequirements Masonry ChimneyMasonry Chimney Requirements Chimney Height Requirements Masonry Chimney RequirementsOn Next Contiued on Next Part B Contin Metal Prefabricated Chimney Requirements Metal Prefabricated Chimney InstallationDetail Connection Detail Connection Minimum Clearances to Combustible Materials in Inches Heater InstallationMinimum Clearances to Combustible Wall and Ceilings When Chimney Connector Exits Through the Ceiling To Install the HeaterInstallation of Chimney Shield Burning Coal in your 4027/ASA7 Operating InstructionsDraft Controls LoadingIncreasing Heat From a Low Fire ShakingSafety ASA7 Model 4027 & ASA7 Parts List HOW to Order Repair Parts