LINE SET

IMPORTANT — Refrigerant lines must not contact structure.

 

INSTALLATION

 

Line Set Isolation — The following illustrations are

REFRIGERANT LINE SET — INSTALLING

VERTICAL RUNS (NEW CONSTRUCTION SHOWN)

examples of proper refrigerant line set isolation:

 

REFRIGERANT LINE SET — TRANSITION

FROM VERTICAL TO HORIZONTAL

ANCHORED HEAVY NYLON

 

WIRE TIE OR AUTOMOTIVE

AUTOMOTIVE

MUFFLER‐TYPE HANGER

MUFFLER‐TYPE HANGER

NOTE — Insulate liquid line when it is routed through areas where the surrounding ambient temperature could become higher than the temperature of the liquid line or when pressure drop is equal to or greater than 20 psig.

IMPORTANT — Refrigerant lines must not contact wall

OUTSIDE WALL

VAPOR LINE

LIQUID LINE

 

 

 

WALL

STUD

STRAP LIQUID LINE TO

VAPOR LINE

LIQUID LINE

NON-CORROSIVE

METAL SLEEVE

VAPOR LINE - WRAPPED

IN ARMAFLEX

REFRIGERANT LINE SET — INSTALLING

HORIZONTAL RUNS

To hang line set from joist or rafter, use either metal strapping material or anchored heavy nylon wire ties.

WOOD BLOCK

BETWEEN STUDS

WIRE TIE

INSIDE WALL

STRAP

NON-CORROSIVE

METAL SLEEVE

WIRE TIE

WOOD BLOCK

WIRE TIE

STRAP

SLEEVE

 

WIRE TIE (AROUND

 

VAPOR LINE ONLY)

8 FEET (2.43 METERS)

 

STRAPPING

 

MATERIAL (AROUND

 

VAPOR LINE ONLY)

 

FLOOR JOIST OR

 

ROOF RAFTER

TAPE OR

 

 

WIRE TIE

VAPOR LINE WRAPPED

WITH ARMAFLEX

OUTSIDE

WALL

LIQUID LINE

TAPE OR

WIRE TIE

FLOOR JOIST OR ROOF RAFTER

8 FEET (2.43 METERS)

NON-CORROSIVE

METAL SLEEVE

STRAP THE VAPOR LINE TO THE JOIST OR RAFTER AT 8 FEET (2.43 METERS) INTERVALS THEN STRAP THE LIQUID LINE TO THE VAPOR LINE.

PVC

CAULK

PIPE

 

FIBERGLASS

INSULATION

NOTE — Similar installation practices should be used if line set is to be installed on exterior of outside wall.

FIGURE 5

Page 3

13ACX SERIES

Image 3
Contents Setting the Unit -- Clearances GeneralMinimum Clearance Between TWO Units Placement Setting the Unit CONTIN­ UED -- Unit PlacementUnit Dimensions Inches MM Unit DimensionsVertical Runs NEW Construction Shown InstallationRefrigerant Line SET Installing Refrigerant Line SET Installing Horizontal RunsLiquid Line Filter Drier Installation Typical Liquid Line Filter Drier InstallationRefrigerant Line SET Inches MM 2CONNECT Gauges and Equipment for Flushing Procedure 1CUT and Debur Refrigerant Piping -- Brazing Procedures7PREPARATION for Next Step Wrap Service ValvesFlow Nitrogen 6BRAZE Line SETEqualizer Line Installation Refrigerant Piping -- Installing Indoor Expansion ValveIndoor Expansion Valve Installation Sensing Bulb InstallationLeak Test Leak Test and EvacuationOpen both manifold valves and start the vacuum pump Evacuation24VAC Transformer Electrical -- Circuit Sizing and Wire RoutingSize Circuit and Install Service Disconnect Switch Install ThermostatOperating Manifold Gauge SET and Service Valves Electrical -- High Voltage and Field Control WiringRouting High VOLTAGE, Ground and Control Wiring High Voltage / Ground Wires Field Control WiringTorque Requirements Homeowners Information Checking and Adding System Refrigerant13ACX Start-Up and Performance Checklist Cooling ModeStart UP Checks