WRAP SERVICE VALVES
To help protect service valve seals during brazing, wrap
FLOW NITROGEN
Flow regulated nitrogen (at 1 to 2 psig) through the refrigeration gauge set into the valve stem port connection on the liquid service valve and out of the suction / vapor valve stem port. See steps 3A, 3B and 3C on manifold gauge set connections.
6BRAZE LINE SET
Wrap both service valves with water
LIQUID LINE SERVICE VALVE
WHEN BRAZING LINE SET TO
SERVICE VALVES, POINT FLAME
AWAY FROM SERVICE VALVE.
IMPORTANT — Allow braze joint to cool. Apply additional
WARNING
FIRE, PERSONAL INJURY, OR PROPERTY DAMAGE
may result if you do not wrap a
Do not open service valves until refrigerant lines and indoor coil have been
DAVENET.
SUCTION / VAPOR LINE
CLOTH
LIQUID LINE
SUCTION / VAPOR LINE
SERVICE VALVE
WHEN BRAZING LINE SET TO
SERVICE VALVES, POINT FLAME
AWAY FROM SERVICE VALVE.
CLOTH
7PREPARATION FOR NEXT STEP
After all connections have been brazed, disconnect manifold gauge set from service ports. Apply additional
FIGURE 9
Page 7