STEP 2 -- REFRIGERANT PIPING -- Removing Existing Indoor Metering Device

 

TYPICAL EXISTING FIXED ORIFICE

 

TYPICAL EXISTING EXPANSION VALVE REMOVAL

1A

REMOVAL PROCEDURE

OR

1BPROCEDURE (UNCASED COIL SHOWN)

(UNCASED COIL SHOWN)

 

 

 

 

STUB END

 

 

DISTRIBUTOR TUBES

 

TWO-PIECE PATCH PLATE

LIQUID LINE

 

 

 

 

(UNCASED COIL ONLY)

 

 

 

 

ORIFICE

 

 

 

 

 

EXPANSION

 

 

 

 

 

 

 

LIQUID LINE ORIFICE HOUSING

 

 

HOUSING

 

 

 

DISTRIBUTOR

VALVE

 

 

 

 

 

 

 

 

 

 

 

 

 

TEFLON® RING

 

TUBES

 

 

TEFLON®

 

 

 

 

 

RING

 

FIXED ORIFICE

 

 

 

 

 

 

BRASS NUT

 

 

TEFLON®

 

 

 

 

 

 

SENSING

 

 

 

 

 

RING

 

 

 

 

 

 

LINE

DISTRIBUTOR ASSEMBLY

REMOVE AND DISCARD

WHITE TEFLON® SEAL

(IF PRESENT) LIQUID LINE ASSEMBLY (INCLUDES STRAINER)

AOn fully cased coils, remove the coil access and plumbing panels.

BRemove any shipping clamps from the liquid line and distributor as­ sembly.

CUsing two wrenches, disconnect liquid line from liquid line orifice hous­ ing. Take care not to twist or damage distributor tubes during this pro­ cess.

DRemove and discard fixed orifice, valve stem assembly (if present) and Teflon® washer as illustrated above.

EUse a field-provided fitting to temporarily reconnect the liquid line to the indoor unit's liquid line orifice housing.

2CONNECT GAUGES AND EQUIPMENT FOR FLUSHING PROCEDURE

DISTRIBUTOR EQUALIZER

ASSEMBLY LINE

LIQUID LINE

ASSEMBLY WITH

BRASS NUT

MALE EQUALIZER

 

 

LINE FITTING

VAPOR

 

 

LIQUID

SENSING BULB

LINE

LINE

 

 

 

AOn fully cased coils, remove the coil access and plumbing panels.

BRemove any shipping clamps from the liquid line and distributor assembly.

CDisconnect the equalizer line from the expansion valve equalizer line fitting on the vapor line.

DRemove the vapor line sensing bulb.

EDisconnect the liquid line from the expansion valve at the liquid line assembly.

A

VAPOR LINE SERVICE VALVE

CYLINDER CONTAINING

 

GAUGE

CLEAN HCFC-22 TO BE

 

MANIFOLD

USED FOR FLUSHING

 

 

(Positioned to deliver liquid

 

refrigerant)

 

 

1

LOW

HIGH

NEW

OUTDOOR

UNIT

FDisconnect the expansion valve from the liquid line orifice housing. Take care not to twist or damage distributor tubes during this process.

GRemove and discard expansion valve and the two Teflon® rings.

HUse a field-provided fitting to temporarily reconnect the liquid line to the indoor unit's liquid line orifice housing.

3FLUSHING LINE SET

OPENED CLOSED

EXISTING

INDOOR

UNITB

LIQUID LINE SERVICE

VALVE

RECOVERY

 

CYLINDER

TANK

 

RETURN

 

VAPOR LIQUID

C

DISCHARGE

D

 

 

INLET

 

 

 

 

 

 

RECOVERY MACHINE

The line set and indoor unit coil must be flushed with at least the same amount of clean refrigerant that previously charged the system. Check the charge in the flushing cylinder before proceeding.

ASet the recovery machine for liquid recovery and start the recovery machine. Open the gauge set valves to allow the recovery machine to pull a vacuum on the existing system line set and indoor unit coil.

BPosition the cylinder of clean HCFC-22 for delivery of liquid refrigerant and open its valve to allow liquid refrigerant to flow into the system through the vapor line valve. Allow the refrigerant to pass from the cylinder and through the line set and the indoor unit coil before it enters the recovery machine.

AHCFC-22 cylinder with clean refrigerant (positioned to deliver liquid refrigerant) to the vapor service valve.

BHCFC-22 gauge set (low side) to the liquid line valve.

CHCFC-22 gauge set center port to inlet on the recovery machine with an empty recovery tank connected to the gauge set.

DConnect recovery tank to recovery machine per machine instructions.

CAfter all of the liquid refrigerant has been recovered, switch the recovery machine to vapor recovery so that all of the HCFC-22 vapor is recovered. Allow the recovery machine to pull the system down to 0.

DClose the valve on the inverted HCFC-22 drum and the gauge set valves. Pump the remaining refrigerant out of the recovery machine and turn the machine off.

FIGURE 7

Page 5

13ACX SERIES

Image 5
Contents Minimum Clearance Between TWO Units Setting the Unit -- ClearancesGeneral Unit Dimensions Inches MM Setting the Unit CONTIN­ UED -- Unit PlacementUnit Dimensions PlacementRefrigerant Line SET Installing InstallationRefrigerant Line SET Installing Horizontal Runs Vertical Runs NEW Construction ShownRefrigerant Line SET Inches MM Liquid Line Filter Drier InstallationTypical Liquid Line Filter Drier Installation 2CONNECT Gauges and Equipment for Flushing Procedure 1CUT and Debur Refrigerant Piping -- Brazing ProceduresFlow Nitrogen Wrap Service Valves6BRAZE Line SET 7PREPARATION for Next StepIndoor Expansion Valve Installation Refrigerant Piping -- Installing Indoor Expansion ValveSensing Bulb Installation Equalizer Line InstallationLeak Test Leak Test and EvacuationOpen both manifold valves and start the vacuum pump EvacuationSize Circuit and Install Service Disconnect Switch Electrical -- Circuit Sizing and Wire RoutingInstall Thermostat 24VAC TransformerRouting High VOLTAGE, Ground and Control Wiring Electrical -- High Voltage and Field Control WiringHigh Voltage / Ground Wires Field Control Wiring Operating Manifold Gauge SET and Service ValvesTorque Requirements Homeowners Information Checking and Adding System RefrigerantStart UP Checks 13ACX Start-Up and Performance ChecklistCooling Mode