TABLE OF CONTENTS
CONTENTS
3 1. RECEIVINGEQUIPMENT
32. GENERAL SPECIFICATIONS AND DIMENSIONS
4General Safety Precautions
6 | 3. INSTALLATIONPROCEDURES | |
6 | - Code Requirements | |
6 | - Clearance Requirements for all Models | |
6 | - Combustion/Ventilation Air | |
7 | - Venting Connections | |
8 | - Common Vents | |
10 | - | Gas Supply Connections |
11 | - | Water Connections & System Piping |
13 | - | Electrical Wiring |
14 | - | Wiring Diagrams |
19 | 4. SERVICING PROCEDURES | |
19 | - | Sequence of Operation |
19 | - | Start Up Procedures |
24 | - | Inspection Procedures |
25 | - | Repair Section |
26 | 5. TROUBLE SHOOTING GUIDE |
30 | - Adjustments/Replacements of Components |
336. REPLACEMENT PARTS LIST
35WARRANTY
These instructions are provided to assure the proper installation and operation of Raypak water heaters. Should questions arise regarding the specifications, installation, operation or servicing of these water heaters, we suggest that the local Sales representative or the factory be consulted.
2