Raypak 260-401 manual Electricalwiring, Wiring Diagram KEY

Page 13

ELECTRICALWIRING

The electrical power supply requirement for these heaters is 115 volts, 60 Hz. Field wiring connections and electrical grounding must comply with the local codes, or in the absence of local codes, with the latest edition of the National Electrical Code, ANSI/NFPA 70. Provide a separate fused circuit from the main electrical panel to the heater, and a disconnecting means within sight of the heater.

Remove the control box cover and make the power supply connections in the field wiring compartment. The pump is supplied and factory wired to operate with the heater. The current draw is approximately 2.0 amps. Refer to the heater internal wiring diagrams shown on pages 13 to 15.

WIRING DIAGRAM KEY

NOTE: If it is necessary to replace any of the original wiring, it must be replaced with 105°C wire or its equivalent, except 150° black wire which must be replaced with 150° wire or its equivalent.

Fig. #8096.2

13

Image 13
Contents For Your Safety Installation and Operating InstructionsTable of Contents Specifications and Dimensions General SpecificationsReceiving Equipment General Safety Precautions Scalding TIME/TEMPERATURE Relationships in ScaldsCoderequirements Installation ProceduresMountingbase Fig. #8280.1 OutdoormodelsFig. #9351 Vent TERMINAL/INDOOR Stack Installation GAS Supply Connections Common VentsGAS Pressure Regulator GAS PRESSURE-SPECIFICATIONSWater Connections & System Piping Relief Valve LOW NOx WH1Wiring Diagram KEY ElectricalwiringModels 260 Wiring Diagram Standing PilotFig. #2373 Wiring Diagram Intermittent Ignition Device IID ModelModels 330 Wiring Diagram Intermittent Ignition Device IIDModel 261 LOW NOx Model 401 LOW NOx START-UPPROCEDURES Servicing ProceduresSequenceofoperation Intermittentignitiondeviceiid Fig.#8083.2 What to do if YOU Smell GASFor Automatic Ignition Models System Shut Down ProcedureTo Turn OFF GAS to Appliance Inspectionprocedures BurnersFor Automatic Ignition Systems Burner Adjustment START-UP Procedures S8610BHigh GAS Pressure Switch OperationBurner Drawer Removal Normal Inspection ProceduresGAS Valve Removal Main Burner and Orifice RemovalRepair Section Heat Exchanger RE-ASSEMBLYHeatexchangerremoval Combustion Chamber RemovalImportant Notice Trouble Shooting GuidePiping Troubleshooting Honeywell S8600 TroubleshootingElectrical Electronic Ignition IID High VoltageHigh Voltage Electrical Standing PilotADJUSTMENTS/REPLACEMENTSOF Components RAYPAK, INC Replacement Parts ListFor Units with a LOW NOx Tray Page Page Limitedpartswarrantyeconopakwaterheaters