Raypak 241275 manual

Page 22

www.raypak.com

Raypak, Inc., 2151 Eastman Avenue, Oxnard, CA 93030 (805) 278-5300 Fax (805) 278-5468 Raypak Canada Limited, 2805 Slough St., Mississauga, Ontario, Canada L4T 1G2 (905) 677-7999 Fax (905) 677-8036 Litho in U.S.A.

Image 22
Contents Installation and Operating Instructions Page General Safety Time/Temperature Relationships in ScaldsInstallation Cold Water StartConnecting Power to the Controller OperationMode Selection Switch Cold Start Sequence OperationTroubleshooting Elodrive Actuator Rotation Knob SettingCold Water Start Troubleshooting Guide Wiring Diagram Cold Water RUN Injection & Heater Pump Comparison Hi Delta Model PumpInjection Pump Cover Installation Before StartingPlace the cover on the pump Typical Boiler Piping Hi Delta shown START-UP Procedure Sequence of OperationWiring Diagram Cold Water Run Troubleshooting Guide StepIllustrated Parts Lists Cold Water StartCall OUT Description HI Delta MVB Cold Water Run Call Description HI Delta MVB OUT