Raypak 241275 manual Installation and Operating Instructions

Page 1

INSTALLATION AND OPERATING

INSTRUCTIONS

COLD WATER START & COLD WATER RUN

For Hi Delta & MVB

Heaters & Boilers

This manual should be maintained in legible condition and kept adjacent to the heater or in another safe place for future reference.

Catalog No: 1000.57A

Effective: 02-28-07

Replaces: 02-24-06

P/N 241275 Rev. 2

Image 1
Contents Installation and Operating Instructions Page Time/Temperature Relationships in Scalds General SafetyCold Water Start InstallationOperation Connecting Power to the ControllerCold Start Sequence Operation Mode Selection SwitchElodrive Actuator Rotation Knob Setting TroubleshootingCold Water Start Troubleshooting Guide Wiring Diagram Cold Water RUN Model Pump Injection & Heater Pump Comparison Hi DeltaBefore Starting Injection Pump Cover InstallationPlace the cover on the pump Typical Boiler Piping Hi Delta shown Sequence of Operation START-UP ProcedureWiring Diagram Step Cold Water Run Troubleshooting GuideCold Water Start Illustrated Parts ListsCall OUT Description HI Delta MVB Cold Water Run Call Description HI Delta MVB OUT