Raypak 241275 manual Cold Start Sequence Operation, Mode Selection Switch

Page 6

NOTE: The minimum return water temperature to the heater to prevent condensate is 105°F on stan- dard heaters and 120°F on 87% Efficiency heaters. Ensure that during operation the Set Point Pot is adjusted properly.

Cold Start Sequence of

Operation

1)

120VAC to heater sends 120VAC to Cold Start

 

control on terminal block 1.

2)

120/24VAC transformer and 120VAC-12VDC con-

 

verter are powered.

3)

120/24VAC transformer outputs 24VAC to pin 2 of

 

terminal block 2

4)

24VAC leaves pin 2 of terminal block 2 and goes

 

to the modulating three way valve on the 20-

 

30VAC lead, and to the NO contacts of the SPST

 

relay located in the cold start control panel.

5)

120VAC-12VDC converter outputs 12VDC to pin 3

 

of terminal block 2.

6)

The 12VDC signal leaves pin 2 of terminal block 2

16)Once the NO contacts of the DPST close, the heater 24 VAC is sent back to the heater to com- plete the Economaster circuit (pin 3 of terminal block 3) and the interlock circuit (pin 1 of terminal block 3) allowing the heater to fire.

17)Pin FR on the TVC board outputs 10VDC to the modulating three way valve actuator to drive it fully open for two-minutes waiting for the heater to reach full fire.

18)After the two-minute delay the 10VDC output sig- nal from pin FR reduces to approximately 8VDC at the inverter thus slowing the pump to approxi- mately 50 Hz.

19)The output signal continues to vary depending on the heater inlet temperature.

The heater will lockout and shut down if the set point on the inlet temperature is not achieved within seven- minutes from a call for heat.

The DIP switches on the 3-way valve actuator must be set as indicated in the Fig. 6.

 

and goes to the common terminal of the reset

 

switch, located on the bottom of the cold start con-

 

trol panel.

7)

The 12VDC signal crosses over the reset switch

 

and goes to Pin FS on cold start circuit board.

8)

Cold start control remains on standby until a Call

 

for heat occurs at heater.

9)

TRIG terminal of Economaster connection on

 

heater CPW board outputs 24VAC to terminal 4 of

 

terminal block 3 located in Cold Start controller.

10)

Terminal 4 of TB 3 sends 24VAC to the coil of the

DIP SWITCH SETTINGS FOR 3-WAY ACTUATOR

VDC

mA

0-10

2-10

DA

RA

FIXED

AUTO

~

6-9

MODE SELECTION SWITCH

DIRECT ACTING, ON INCREASING SIGNAL

SWITCH MUST BE IN THIS POSITION TURN CLOCKWISE TO FURTHEST STOP

SPST relay located in the cold start control panel.

11) The SPST relay coil is energized and closes the

contacts allowing 24VAC to energize the CFH pin

on the cold start circuit board.

a)A two second delay occurs from the CFH signal waiting to send power from terminal MC of the cold start circuit board.

12)J9 terminal on the heater CPW board (interlock connection) outputs a 24 VAC signal to terminal 2 of terminal block 3 located in the cold start con- troller.

13)24 VAC is sent from terminal 2 of terminal block 3 to the NO contacts of the DPST relay located in the cold start control panel.

14)After the two second delay on the cold start circuit board, pin MC outputs a 24 VAC signal to the coil of the DPST relay located in the cold start control panel.

15)The DPST relay coil energizes and closes the NO contacts.

Fig. 6: Set Dip Switch Settings — Delta Actuator

Fig. 7: Delta Actuator — Actuator Shown in Full System

Flow Position

6

Image 6
Contents Installation and Operating Instructions Page General Safety Time/Temperature Relationships in ScaldsInstallation Cold Water StartConnecting Power to the Controller OperationMode Selection Switch Cold Start Sequence OperationTroubleshooting Elodrive Actuator Rotation Knob SettingCold Water Start Troubleshooting Guide Wiring Diagram Cold Water RUN Injection & Heater Pump Comparison Hi Delta Model PumpInjection Pump Cover Installation Before StartingPlace the cover on the pump Typical Boiler Piping Hi Delta shown START-UP Procedure Sequence of OperationWiring Diagram Cold Water Run Troubleshooting Guide StepIllustrated Parts Lists Cold Water StartCall OUT Description HI Delta MVB Cold Water Run Call Description HI Delta MVB OUT