Raypak 302-902 manual Section N HI-DELTA Initial START-UP, Tools Needed, Preparation for START-UP

Page 55

SECTION N: HI-DELTA INITIAL START-UP

1.0TOOLS NEEDED

One 12-0-12, 24” scale manometer

6-0-6, 12” scale manometers

7/16” open end wrench

1/2” open end wrench

Screwdriver

Volt meter

3/16” Allen wrench

Jumper cable

2.0PREPARATION FOR START-UP

WARNING: DO NOT TURN ON GAS AT THIS TIME

2.1Check Power Supply

With volt meter at incoming power check voltage between:

Hot - Common

(~120VAC)

Hot - Ground

(~120VAC)

Common - Ground

(< 1VAC)

If Common - Ground is > 1 VAC - STOP: Contact electrician to correct ground failure. Warning: Failure to do this may burn out 120V-24V transformer, or may cause other safety control damage or failure.

2.2 Attach Manometers to Measure Pressures

Attach 24" scale manometer to the first main gas shut-off valve pressure tapping.

Attach one 12" scale manometer to the outlet side of the second main gas shut-off valve pressure tapping.

Attach one 12" scale manometer to — Pull rubber tube from air pressure switch off the aluminum tubing and connect the manometer using a tee.

Turn Off Main Gas Valve;

2.3 Check the Gas Supply Pressure

1.Slowly turn on main gas shut-off valve;

2.Read the gas supply pressure from the manometer; minimum supply pressure for natural gas is 5” W.C., recommended supply is 7” W.C., minimum supply pressure for propane is 11” W.C.

3.If pressure is > 14" W.C.; Turn off the valve;

4.Check if the service regulator is installed and/or adjust the service regulator;

55

Image 55
Contents Installation Operating Instructions Table of Contents Page Section a Before Installing the Boiler Model Identification High Delta Component Location General Information Stacking Equipment BaseBoiler Side 302-902 Boiler SizeOutdoor Installation Minimum Clearances OutdoorinstallationsSection C Combustion and Ventilation AIR Direct VENT-INSTALLATONCombustion and Ventilation AIR Indoor Units Page Reliefvalve Piping LOW Temperature SystemTemperature & Pressure Gauge Section D Water Piping GeneralSection E Hydronic Heating Piping Fig. #9223 DUALBOILERPRIMARY/SECONDARYPIPINGPotable Water and Space Heatingapplication Section F Domestic HOT Water PipingSingle Domestic HOT Water Heater with ONE Storage Tank Bypass Section G Pool HeatingWinterizingyour Heater Automatic Chlorinators and ChemicalfeedersSpawater Chemistry Singlepoolheaterapplication GAS Supply Connection Section H GAS Supply ConnectionsGAS Supply Pressure GAS Pressure Regulator FIELD-CONNECTEDCONTROLLERS Section I Electrical Power ConnectionsCheck the Power Source Check Power SourceMaking the Electrical Connections Field Wiring ConnectionShockhazard Electrical Connections Domestic HOT WaterDefinition ofAppliance Categories Section J Venting ConnectionsTable J-1 Vent Terminal Location General Support of Vent StackVenting Configurations Venting Installation TipsNatural Draft Verticalvent Section J-1 Natural Draft Vertical Venting CategoryNatural Draft Vertical Vent Termination Natural Draft Vertical Venting System InstallationPage HORIZONTALTHRU-WALLVENTING Category III Table Section J-2Fig. #9436 HI Delta Sleeve Flue ConversionHorizontal Thru-wall Direct Vent Termination HORIZONTALTHRU-WALLVENTING Table Section J-3 Direct VentHorizontal Thru-wall Direct Vent Termination Verticalventing Table Direct VentVertical Direct Vent Termination Vertical Direct Vent System InstallationHideltaoutdoorventkitandinstructions Section J-5Heater as shipped HI Delta Outdoor Vent InstructionsFinished assembly Thiskitincludes Model Partnumber HI Delta Filter BOX KITHI Delta Filter BOX Instructions Filter Section K Controls HI-DELTAModel Boiler Sequence of OperationsHI-DELTAModel HI-DELTAModel902 Operating Control High Limit Manual ResetFlow Switch Ignition Control ModuleGAS Pressure Switch LOW Water Cutoff High and LOW GAS Pressure SwitchesLOW Water CUT OFF Optional Wire Diagram Model Reference Drawing Number M152470-Rev. J H3/W3 Reference Drawing Number M152464-Rev R H3/HW3 Reference Drawing Number M152465 Rev-P H3/W3 TIME/TEMPERATURE Relationships in Scalds Section L General Safety PrecautionsSection M PRE-START-UP Turn Off Main Gas Valve Section N HI-DELTA Initial START-UPTools Needed Preparation for START-UPYour Hi-Delta is tuned START-UPPilot Turn Down Test for Raypak HI Delta Boilers Leak Test Procedure DUAL-SEAT GAS ValvesPage Section O Post START-UP Check Toturn Offgastoappliance Section P OperationSuggested Minimum Maintenance Schedule Section Q MaintenanceAnnually Preventive Maintenance ScheduleWeekly Semi-AnnuallyInsidecombustionaircontamination Appendix aCorporate Headquarters

302-902 specifications

The Raypak 302-902 is a highly efficient, reliable, and versatile heating solution commonly used in residential and commercial pool heating applications. Known for its exceptional performance and advanced technology, the Raypak 302-902 has become a favored choice among pool owners looking to extend their swimming season and enhance comfort.

One of the main features of the Raypak 302-902 is its robust construction. Built with a copper heat exchanger, it is designed to withstand the rigors of continuous use while offering superior heat transfer capabilities. The heat exchanger is also designed for easy maintenance, enabling pool owners to keep their systems running efficiently for years.

The Raypak 302-902 employs advanced digital controls, which provide precise temperature regulation. This modern control system allows users to set their desired water temperature with accuracy and maintain it consistently, ensuring a pleasant swimming experience. Additionally, these digital controls feature self-diagnostic capabilities, alerting users to potential issues, which aids in quick troubleshooting and maintenance.

In terms of energy efficiency, the Raypak 302-902 stands out with its ability to harness energy effectively, leading to significant savings in operational costs. It is equipped with an efficient gas burner, which optimizes fuel consumption while delivering rapid heating performance. This efficiency is complemented by its ability to operate with natural gas or propane, making it adaptable to various setups and preferences.

The unit also prides itself on its environmentally friendly operation. It meets stringent regulations for emissions, ensuring that pool owners can enjoy a pool heating solution that is both effective and reduces its ecological footprint. This focus on sustainability has made it a popular choice among environmentally conscious consumers.

Moreover, the Raypak 302-902 is designed for versatility. It can be easily integrated with existing pool systems and is compatible with both in-ground and above-ground pools. This flexibility allows it to cater to a wide range of pool sizes and configurations, making it suitable for both residential and commercial applications.

In conclusion, the Raypak 302-902 offers an array of features, technologies, and characteristics that make it a top contender in the pool heating market. With its durable construction, advanced digital controls, energy efficiency, and environmentally friendly operation, it remains a reliable choice for those seeking comfort and convenience in their swimming experience. Whether for a backyard oasis or a commercial facility, the Raypak 302-902 delivers consistent performance and accessibility.