Lennox International Inc 4HP18LT Placement, Line Set Isolation, Refrigerant Line Set Diameters

Page 5

Placement

Be aware that some localities are adopting sound ordinances based on how noisy the unit is at the neighbor’s home, not at the original installation. Install the unit as far as possible from the property line. When possible, do not install the unit directly outside a bedroom window. Glass has a verry high level of sound transmission. Figure 5 shows how to place the outdoor unit and line set to reduce line set vibration.

Line Set Isolation

Illustrations on pages 6 and 7 demonstrate procedures which ensure proper refrigerant line set isolation. Figure 6 shows how to install line sets on horizontal runs. Figure 7 shows how to make a transition from horizontal to vertical. Figure 8 shows how to install line sets on vertical runs.

Refrigerant Line Set Diameters (in.)

Liquid Line

Line Set Length and Size

BTUH

 

12 ft. 25 ft. 50 ft. 75 ft. 100 ft.

24,000

3/8

3/8

3/8

3/8

3/8

36,000

3/8

3/8

3/8

3/8

1/2

48,000

3/8

3/8

3/8

1/2

1/2

60,000 3/8 3/8 3/8 1/2 1/2

S uction Line

Line S et Length and S ize

B T UH

 

12 ft. 25 ft. 50 ft. 75 ft. 100 ft.

24,000

3/4

3/4

3/4

3/4

7/8

36,000

7/8

7/8

7/8

7/8

1-1/8

48,000

7/8

7/8

7/8

1-1/8

1-1/8

60,000 1/8 1/8 1-1/8 1-1/8 1-1/8

For installations exceeding 50’, contact

Technical Services.

Table 2

Brazing Connection Procedure

1.Cut ends of refrigerant lines square (free from nicks or dents). Debur the ends. The pipe must remain round; do not pinch end of line.

2.Before making line set connections, use dry nitrogen to purge the refrigerant piping. This will help to prevent oxida- tion and the introduction of moisture into the system.

3.Use silver alloy brazing rods (5% or 6% silver alloy for copper-to-copper brazing or 45% silver alloy for copper-to- brass or copper-to-steel brazing) which are rated for use with R410A refrigerant.

4.Remove the Schrader core assemblies before brazing to protect them from damage due to extreme heat. Replace the cores when brazing is complete.

5.Remove light maroon washers from service valves and shield light maroon stickers to protect them during brazing. Wrap a wet cloth around the valve body and copper tube stub to protect it from heat damage.

Outside Unit Placement & Installation

Install unit away from windows

Two 90° elbows installed in lineset will reduce lineset vibration

Figure 5

506470-01

Issue 1007

Page 5

Image 5
Contents Lennox International Inc. Company Save these instructions for future referenceInstallation Clearances InstallationGeneral Torque TableSlab Mounting Electrical WiringSlab Mounting Roof MountingRefrigerant Piping Installing Refrigerant LineOutside Unit Placement & Installation PlacementLine Set Isolation Refrigerant Line Set DiametersRefrigerant Line Sets Installing Horizontal Runs Refrigerant Line Sets Transition from Vertical to Horizontal Required Euipment Flushing ProcedureExpansion Valve Systems Refrigerant Metering DeviceTo Close Liquid or Suction Line Service Valve To Access the Schrader PortEvacuation Using an Electronic Leak DetectorIssue Refrigerant Charging Refrigerant Charge AdjustmentSTART-UP Issue R410A Temperature/Pressure Chart Approach Values for TXV Systems Issue Operation Compressor Delay Defrost Control Timing PinsTime Delay Pressure Switch CircuitLED Description System Diagnostic ModuleInterpreting the Diagnostic LEDs 24VAC Power Wiring Miswired Module Codes Thermostat Demand WiringMaintenance Homeowner Information Inspect and clean outdoor coilTemperature Setting Levers System Switch Fan SwitchTemperature Indicator Indicating LightStart-Up and Performance Checklist Wire Diagram Issue