GE 8500 Series installation instructions Install and Connect the Case, Unit to the Case

Page 20

Installation Instructions

INSTALL AND CONNECT THE CASE

1.Remove the front case panel and pull

the unit out of the case. Place the empty case onto the platform in the closet with the outdoor side facing the wall plenum opening. Align the case with plenum opening and attach with six field-supplied sheet metal screws (corrosion-resistant screws recommended).

2.Adjust all four leveling legs until the case is level.

Inside

wallRigid ductwork

5a INSTALL AND GROUND

THE UNIT TO THE CASE

UNIT INSTALLED THROUGH FRONT OF CASE

1.Slide the back of the unit into the case. Push the unit all of the way into the case until it stops.

NOTE: Either of the case sides may be removed to enable the unit to be slid into the case.

2.Ground the unit to the case by installing the front case-to-unit hex-bolt and discard the two case-to-unit side screw.

Air discharge outlet

Leveling legs

3.Using field-supplied screws, bolt the case to the platform.

4.Connect the internal or external drain(s) as necessary.

Secondary 34drain option. If not used, seal with a MNPT plug

Primary female drain fitting 34

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

External

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

drain

NOTE: Piping is not

 

Bolt case

 

 

 

 

 

OR

 

 

 

 

 

 

Internal

supplied with the unit.

to platform

 

 

 

 

 

 

 

 

 

 

drain(s)

Obtain locally.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Side screw

 

 

 

 

 

Hex bolt

Side screw

 

 

 

 

 

 

INSTALL AND GROUND

THE UNIT TO THE CASE

UNIT INSTALLED THROUGH SIDE OF CASE

1.Slide the side of the unit into the case. Push the unit all of the way into the case until it stops.

NOTE: Either of the case sides may be removed to enable the unit to be slid into the case.

2.Attach the case side panel to the main case.

3.Ground the unit to the case by installing the front unit-to-case hex-bolt and discard the two case-to- unit side screw.

 

Side screw

Side screw

 

 

(may be

 

installed on

 

either side)

Hex bolt

 

20

Image 20
Contents Warranty Air FiltersPreparation Model # Serial #Safety Precautions Controls-dip switches Controls-Dip SwitchesTroubleshooting All Electric Heat Heat pump models onlyConstant on Fan Occupancy Sensor Field SuppliedDuct Freeze Sentinel Requires room air sensor kit-RAVRMSGEAppliances.com Temperature Limiting Requires room air sensor kit-RAVRMSTemperature limiting during Cool mode Controls-terminal connections Controls-Terminal ConnectionsRoom Air Sensor Requires room air sensor kit Ravrms Also be connected to the remote thermostatCentral Desk Control Remote ThermostatMotion Sensor Obtained locally Door Sensor Obtained locallyOther features of your Zoneline On/Off SwitchVentilation Control About Heat Pumps on some modelsCare and cleaning DrainBase Pan Air FiltersInstallation Recommended branch circuit wire sizes For 230/208 Volt Cord Connections onlyFor 230/208 Volt Direct Connect Applications only Remove Junction BOX CoverAttach Conduit Important Connection of a 265V AC productMake Wire Lead Connections Inside the Junction BOX Power Connection ChartRequired Accessories Zoneline ComponentsModel Type Electronic ThermostatTypical Utility Closet and Dimensions Top ViewUtility Closet Connection Locations Unit-mounted filter with a field-supplied return Air grille and access door/panelOption Build and Install the Zoneline Base Platform Install the Drains Ductwork000 BTU 12,000 BTU 18,000 BTU 390 415 440 465 490 435 485 535Install and Connect the Case Install and Ground Unit to the CaseAdjust all four leveling legs until the case is level Unit to the CaseConnect the TOP Duct Maximum Wiring Length for Thermostat Connection to the UnitMake Unit Electrical Connections Servicing Connect PowerFinal Check Before You Call For Service… Power failure Indoor airflow is restrictedUnit is unplugged Air filter is dirtyMinute delay Things that are normalNormal Operating Sounds Compressor. You may also hear a fan noise stop and startGEAppliances.com Page Vertical Zoneline Warranty For The Period GE Will ReplaceWhat GE Will Not Cover Model numberSchedule Service Parts and AccessoriesConsumer Support GE Appliances Website Real Life Design Studio

8500 Series specifications

The GE 8500 Series represents a remarkable advancement in the realm of industrial gas turbines, combining efficiency, reliability, and flexibility. Designed to meet the demands of current energy markets, this series of turbines is engineered for both baseload and peak-load applications, making it an ideal choice for operators seeking to optimize their energy production.

One of the standout features of the GE 8500 Series is its exceptional thermal efficiency. With a capability of achieving efficiency levels exceeding 60%, these turbines significantly reduce fuel consumption and lower greenhouse gas emissions. This feature not only makes them environmentally friendly but also helps operators reduce operational costs in the long run, positioning them favorably in a competitive energy landscape.

The GE 8500 Series incorporates advanced airfoil technologies that enhance performance. Featuring an innovative blade design, these turbines are capable of operating efficiently across a wide range of operating conditions. The materials used in the construction of the blades are engineered for durability, allowing them to withstand the harsh environments often encountered in power generation. This greatly extends the service life of the turbine and reduces downtime for maintenance.

Another important aspect of the GE 8500 Series is its adaptability. These turbines can utilize various fuels, including natural gas, hydrogen, and biofuels, offering flexibility to operators in terms of resource management. This feature allows utilities to adjust to changing fuel availability and price fluctuations, ensuring consistent energy generation.

The control and monitoring systems integrated into the GE 8500 Series are state-of-the-art, featuring advanced digital control technologies that provide real-time performance data. This allows operators to make informed decisions regarding maintenance and operational adjustments, ultimately enhancing the overall reliability of the power generation system.

In addition to these advancements, the GE 8500 Series is designed with a focus on reduced emissions without compromising performance. The turbines incorporate advanced combustion technologies that facilitate ultra-low emissions, aligning with the global movement toward cleaner energy solutions.

In conclusion, the GE 8500 Series is an exceptional line of gas turbines that combines high efficiency, flexibility, and low emissions. With advanced technologies and robust features, these turbines are positioned to meet the evolving needs of the energy sector while supporting the transition to a more sustainable future.