Samsung AM27B1C13 Connecting Up and Purging the Circuit, Use Vacuum Pump as shown at the figure

Page 45

COMPLETING THE INSTALLATION

Connecting Up and Purging the Circuit

The outdoor unit is loaded with sufficient R22 refrigerant for 5m(16ft. 5in) of piping. The air in the indoor unit and in the pipe must be purged.

If air remains in the refrigeration pipes, it will affect the compressor, reduce to cooling capacity and could lead to a malfunction. Refrigerant for air purging is not charged in the outdoor unit.

Use Vacuum Pump as shown at the figure.

1Connect each assembly pipe to the appropriate valve on the outdoor unit and tighten the flare nut.

2Referring to the illustration opposite, tighten the flare nut first manually and then with a wrench, applying the following torque.

Pipe

Outer Diameter

Torque

Liquid refrigerant

6.35 mm(1/4˝)

160kg•cm(11.6ft•lb )

Gas refrigerant

9.52 mm(3/8˝)

300kg•cm(21.8ft•lb )

Gas refrigerant

12.70 mm(1/2˝)

500kg•cm(36.4ft•lb )

3Connect the charging hose of low pressure side of manifold gauge to the packed valve having a service port as shown at the figure.

4Open the valve of the low pressure side of manifold gauge counterclockwise.

5Purge the air from the system using vacuum pump for about 10 minutes.

-Close the valve of the low pressure side of manifold gauge clockwise.

-Make sure that pressure gauge show -0.1MPa(-76cmHg) after about

-10minutes.

-This procedure is very important in order to avoid gas leak.

-Turn off the vacuum pump

-Remove the hose of the low pressure side of manifold gauge.

6Set valve cork of both liquid side and gas side of packed valve to the open position.

7Mount the valve stem nuts and the service port cap to the valve, and tighten them at the torque of 18N•m with a torque wrench.

8Check for gas leakage.

-At this time, especially check for gas leakage from the 3-way valve’s stem nuts, and from the service port cap.

ENGLISH

Outdoor unit

Indoor unit

A

Gas pipe side

C

B

Liquid pipe side

D

Indoor

A-unit

Indoor

B-unit

A

B

Vacuum Pump

The designs and shape are subject to change according to the model.

Valve stem

Liquid side

Stem cap

Gas side

Service port

You can install 15m of connecting pipe to the maximum, and you don’t have to charge any additional refrigerant.

E-45

Image 45
Contents Installation Manual Manual DE Instrucciones Safety Precautions Contents Indoor Unit View of the UnitOutdoor Unit UM18B1C2 Remote Control Buttons and Display Getting Started Installing the Remote Controller Holder Inserting the Remote Control BatteriesSelecting with the Remote Control Using with the indoor unitWay Function To obtain anSelecting the Automatic Operating Mode Cooling Your Room Changing the Room Temperature Quickly Removing Excess Humidity Airing Your Room Adjusting the Air Flow Direction Horizontally Adjusting the Air Flow Direction VerticallyTo Cancel the On Timer Setting the On TimerTo Cancel the Off Timer Setting the Off TimerTo Cancel the Sleep Timer Setting the Sleep TimerTopicRecommendation Operating RecommendationsTemperature and Humidity Ranges Mode Outdoor Temperature Indoor Temperature Indoor HumidityIf the air conditioner is used at... Then Have switched off the breaker used for the unit Cleaning Your Air ConditionerAUTO, Cool Solving Common ProblemsInstalling a Filter Option Model Technical SpecificationsUnit operation Installation Manual Purging the Unit Indoor Unit Deciding on Where to Install the Air ConditionerPiping length and the height Unit26,000Btu/h 27,000Btu/h Air Conditioner and Accessories Accessories in the Indoor Unit CaseAccessories in the Outdoor Unit Case Fixing the Installation Plate Then follow StepsWall Window frame Purging the Unit Connecting the Assembly Cable Outdoor Unit To install the drain hose, proceed as follows Installing and Connecting the Indoor Unit Drain HoseInstalling and Connecting the Indoor Unit Assembly Piping PipeTorque Depth a Cutting/Extending the PipingUM18B1C2 Connecting the Cables to the Outdoor UnitUM26B1C2 UM27B1C318/26 Electrical Work Auxiliary Circuit BreakerChecking Correct Earthing Fixing the Unit in Position Use Vacuum Pump as shown at the figure Connecting Up and Purging the CircuitPerforming Leak Tests To check for gas leaks on Then, using a leak detector CheckPlacing the Indoor Unit in Position Checking and Testing Operations Explaining Operations to the Owner Electronics

AM26B1C13, AM27B1C07, AM27B1C13, UM27B1C3, UM26B1C2 specifications

The Samsung AM27B1C07, UM26B1C2, AM26B1C13, AM27B1C13, and UM18B1C2 are a series of advanced memory devices that underline Samsung's commitment to providing high-performance solutions in the evolving landscape of electronics and computing. These products are characterized by their cutting-edge technologies, reliability, and efficiency, catering to various applications in consumer electronics and industrial use.

One of the main features of these series is their use of Samsung’s state-of-the-art NAND flash technology. This technology is designed to enhance data storage performance while minimizing power consumption, making these devices ideal for portable and battery-operated applications. The devices utilize 3D NAND architecture to increase storage density while ensuring superior durability and speed.

The AM27B1C07 and AM27B1C13 are particularly noted for their high sequential read and write speeds, making them suitable for tasks that require rapid data access, such as gaming and high-definition video processing. These memory solutions support advanced error correction codes (ECC) which ensure data integrity and reliability over time. They have also been optimized for lower latency, enhancing overall system responsiveness.

The UM26B1C2 and UM18B1C2 variants focus on delivering optimized bandwidth, catering well to the demands of modern applications including mobile devices, tablets, and laptops. With integrated power management features, these memory devices help extend battery life while maintaining high-performance levels during peak usage.

All models in this series are built to withstand demanding environments, boasting an extended temperature range that assures stable operation. This feature makes them highly suitable for industrial applications where conditions can fluctuate significantly.

Additionally, Samsung’s commitment to sustainability is evident in these memory solutions. They are designed with energy-efficient processes that not only enhance performance but also reduce the carbon footprint of their production.

Overall, the Samsung AM27B1C07, UM26B1C2, AM26B1C13, AM27B1C13, and UM18B1C2 integrate advanced technologies and features that address the needs of various markets, including consumer electronics, automotive, and industrial sectors. Their blend of high speed, efficiency, and reliability makes them an attractive choice for manufacturers looking to enhance their product offerings with cutting-edge memory solutions.