Heatiator GDST3831I owner manual Covered Alcove Applications, Inches U.S.A

Page 22

C

V

J

B

 

 

 

B

 

 

V

B

 

V

 

D

 

V

 

V

A

F

G

M

V

H or i

X V H

V H V

E

V

A

O

N

P

R

Q

 

 

 

 

V

 

 

 

 

 

 

 

 

L

 

 

 

 

 

K

 

 

 

 

K

 

 

 

 

 

Electrical

 

 

 

V

 

 

 

 

V

 

 

 

 

 

 

V= VENT TERMINAL X = AIR SUPPLY INLET

= AREA WHERE TERMINAL IS NOT PERMITTED

A

=

12 inches

clearances above grade, veranda,

 

 

 

porch, deck or balcony

B

=

12 inches

clearance to window or door that may

 

 

 

be opened, or to permanently closed

 

 

 

window

C

=

18 inches

clearance below unventilated soffit

 

 

18 inches

clearance below ventilated soffit

 

 

30 inches

clearance below vinyl soffits and

 

 

 

electrical service

D

=

6 inches

clearance to outside corner

E

=

6 inches

clearance to inside corner

F

=

3 ft. (Canada)

not to be installed above a gas me-

 

 

 

ter/regulator assembly within 3 feet

 

 

 

horizontally from the center-line of the

 

 

 

regulator

G

=

3 ft

clearance to gas service regulator

 

 

 

vent outlet

H

=

9 inches (U.S.A)

 

12inches (Canada).clearance to non-mechanical (unpow- ered) air supply inlet, combustion air inlet or direct-vent termination

i= 3 ft. (U.S.A.)

6 ft. (Canada)

...........clearance to a mechanical (powered)

 

air supply inlet

All mechanical air intakes within 10 feet of a termination cap must be a minimum of 3 feet below termination.

J

= 7 ft

On public property: clearance above

 

 

paved sidewalk or a paved driveway.

A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.

K

=

6 inches

clearance from sides of electrical

 

 

 

service

L

=

12 inches

clearance above electrical service

Location of the vent termination must not interfere with access to the electrical service.

M = 18 inches

clearanceunderveranda,porch,deck,

 

balcony or overhang

42 inches

vinyl or composite overhang

Permitted when veranda, porch, deck or balcony is fully open on a minimum of 2 sides beneath the floor.

Figure 6.3 Minimum Clearances for Termination

Service

C

V

Covered Alcove Applications

(Spaces open only on one side and with an overhang)

N= 6 inches ........... non-vinyl sidewalls 12 inches ......... vinyl sidewalls

O= 18 inches ......... non-vinyl soffit and overhang 42 inches ......... vinyl soffit and overhang

P= 8 ft.

 

QMIN

RMAX

1 cap

3 feet

2 x Q ACTUAL

2 caps

6 feet

1 x Q ACTUAL

3 caps

9 feet

2/3 x Q ACTUAL

4 caps

12 feet

1/2 x Q ACTUAL

QMIN = # termination caps x 3 RMAX = (2 / # termination caps) x QACTUAL

Measure vertical clearances from this surface.

Measure horizontal clearances from this surface.

CAUTION! Risk of Burns! Termination caps are HOT, consider proximity to doors, traffic areas or where people may pass or gather (sidewalk, deck, patio, etc.). Listed cap shields available. Contact your dealer.

Local codes or regulations may require different clearances.

Vent system termination is NOT permitted in screened porches.

Vent system termination is permitted in porch areas with two or more sides open.

Hearth & Home Technologies assumes no responsibility for the improper performance of the appliance when the venting system does not meet these requirements.

Vinyl protection kits are suggested for use with vinyl siding.

22

Heatilator • GDST3831I • 2127-900 Rev. K • 7/12

Image 22
Contents What to do if you smell gas ModelsHOT Surfaces Congratulations Homeowner Reference InformationTable of Contents User GuideElectrical Information Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fan Kit optional Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by GAS ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing DimensionsClearances Mantel and Wall Projections TOP View Fireplace OpeningTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Inches U.S.AContinue Adding Vent Components Install Support BracketsTo Install the Heat Shield CorrectVent Table Key Vent Information and DiagramsApproved Pipe Use of ElbowsUse of Flex Vent Top Vent Horizontal Termination One Elbow Vent DiagramsV1 Minimum H1 Maximum Top Vent Horizontal Termination Two Elbows V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinExhaust restrictor Instructions V1 Minimum Maximum V1 + V2 Min Wall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Securing and Leveling the ApplianceInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Securing the Vent SectionsInstalling Decorative Ceiling Components Disassemble Vent SectionsInstalling Metal Roof Flashing Assemble and Install Storm CollarInstalling Decorative Wall Components Installing Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallGas Pressure Gas InformationFuel Conversion Gas ConnectionElectrical Information Wiring RequirementsOptional Accessories Requirements Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionalFacing Material Sides using a 300 F minimum sealant. Refer toFinishing Metal front faces may be covered with non-combustibleTo install the Splatter Guard Splatter GuardTo Close the Lower Access Panel To Remove the Splatter GuardAppliance Setup Install the Log Assembly Models ST-550T-IPI. GDST3831INotch Air Shutter Setting Install Trim Kits and SurroundsAir Shutter Settings Symptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Specifications. Polish flame sensing rod with fine steel wool Electrical Access Left View Front View GAS Line Right View Appliance Dimension DiagramReference Materials  B. Vent Components Diagrams Vent Components Diagrams SLP-TVHW14-1/16 330 mm34 mm 357 mmSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP DVP-TB1 Horizontal Termination CAPOptional Wire Harness SLP-LPCStocked Service PartsLog Set Assembly At Depot#9 Valve Assembly StockedService Parts List Contact Information Do not Discard this Manual