Heatiator GDST3831I Junction Box Installation, Wall Switch Installation for Fan Optional

Page 44

E. Junction Box Installation

The junction box must be wired from the INSIDE of the appliance:

Determine which side of the appliance the junction box is located on.

Pull the electrical wires from outside the appliance through the knockout making sure to use a Romex connector to fasten the electrical wires to the unit.

Pull enough wire into the valve compartment to easily reach the junction box location.

Remove the screw attaching the junction box to the junction box bracket and set it aside.

Route the wire through the knockout in the junction box bracket.

Wire the junction box and reattach it to the bracket by inserting the tab in the slot and attaching with screw previously removed. Ensure that a Romex connector is used to attach the electrical wires to the junction box.

F. Wall Switch Installation for Fan (Optional)

If the box is being wired to a wall mounted switch for use with a fan (See Figure 12.5):

The power supply for the appliance must be brought into a switch box.

The power can then be supplied from the switch box to the appliance using a minimum of 14-3 with ground wire.

At the switch box connect the black (hot) wire and red (switch leg) wire to the wall switch as shown.

At the appliance connect the black (hot), white (neutral) and green (ground) wires to the junction box as shown.

Add a 1/4 in. insulated female connector to the red (switch leg) wire, route it through the knockout in the face of the junction box, and connect to the top fan switch connector (1/4 in. male) as shown.

ROMEX CONNECTORS

 

 

NOTICE: DO NOT wire

Figure 12.4 Junction Box Detail

110 VAC to wall switch.

 

MINIMUM 14-3 AWG

 

SWITCH

 

 

WITH GROUND

 

 

 

RED

 

 

BLACK

BLACK

JUNCTION BOX

WHITE

WHITE

GREEN

GREEN

RED BLACK

WHITE GREEN

 

 

SWITCH BOX

POWER

 

SUPPLY

 

 

WIRES

 

KNOCKOUT

 

RED

 

 

Figure 12.5 Junction Box Wired to Wall Switch or BC10

44

Heatilator • GDST3831I • 2127-900 Rev. K • 7/12

Image 44
Contents HOT Surfaces ModelsWhat to do if you smell gas Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingElectrical Information FinishingLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Remote ControlMaintenance Tasks-Qualified Service Technician Gasket Seal and Glass Assembly InspectionVenting LogsBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Framing and Clearances Selecting Appliance LocationClearances Minimum Framing DimensionsConstructing the Appliance Chase Mantel and Wall Projections TOP View Fireplace OpeningTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Inches U.S.AInstall Support Brackets To Install the Heat ShieldContinue Adding Vent Components CorrectVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsUse of Flex Vent V1 Minimum H1 Maximum Vent DiagramsTop Vent Horizontal Termination One Elbow Top Vent Horizontal Termination Two Elbows V1 Minimum H1 + H2 MaximumTop Vent Horizontal Termination Three Elbows V1 Minimum H1 + H2 Maximum V1 + V2 MinExhaust restrictor Instructions V1 Minimum Maximum V1 + V2 Min Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Securing and Leveling the ApplianceInstalling Vent Pipe Assemble Vent SectionsAssemble Slip Sections Securing the Vent SectionsInstalling Decorative Ceiling Components Disassemble Vent SectionsInstalling Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Installing Vertical Termination CapInstalling Decorative Wall Components Install Horizontal Termination Cap 17 Venting through the wallGas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Receiver Junction Box Installation Wall Switch Installation for Fan OptionalSides using a 300 F minimum sealant. Refer to FinishingFacing Material Metal front faces may be covered with non-combustibleTo install the Splatter Guard Splatter GuardTo Close the Lower Access Panel To Remove the Splatter GuardAppliance Setup Install the Log Assembly Models ST-550T-IPI. GDST3831INotch Air Shutter Settings Install Trim Kits and SurroundsAir Shutter Setting Intellifire Ignition System TroubleshootingSymptom Possible Cause Corrective Action Specifications. Polish flame sensing rod with fine steel wool Reference Materials Appliance Dimension DiagramElectrical Access Left View Front View GAS Line Right View  B. Vent Components Diagrams Vent Components Diagrams SLP-TVHW330 mm 34 mm14-1/16 357 mmSLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP DVP-TB1 Horizontal Termination CAPOptional Wire Harness SLP-LPCService Parts Log Set AssemblyStocked At Depot#9 Valve Assembly StockedService Parts List Contact Information Do not Discard this Manual