Heatiator GDST3831I owner manual 330 mm, 34 mm, 14-1/16, 357 mm, 192 mm, Termination Cap

Page 57

B. Vent Components Diagrams (continued)

 

14 in.

 

 

 

 

13 in.

 

356 mm

 

 

 

 

330 mm

10-9/16 in.

 

 

 

 

13 in.

1-5/16 in.

 

 

 

 

34 mm

269 mm

 

 

 

 

330 mm

 

SLP-CCS-BK

 

 

 

SLP-DCF-BK

 

 

 

Ceiling Firestop

Cathedral Ceiling

 

 

 

 

 

 

 

Black

Support Box-Black

 

 

 

 

 

 

 

 

 

14-1/16 in.

 

 

6-11/16 in.

 

7-1/4 in.

357 mm

 

 

169 mm

1 in.

(184 mm)

 

 

10-3/4 in.

 

(25 mm)

 

 

 

 

 

 

14 in.

7-1/2 in.

273 mm

 

 

 

 

 

 

 

 

356 mm

192 mm

 

 

 

 

 

 

SLP-FLEX-TRAP

 

 

14 in.

 

 

Horizontal

 

 

(356 mm)

 

 

Termination Kit

 

 

 

 

 

 

 

 

 

3/8 in. (10 mm)

 

10-11/16 in.

 

 

1 in. (25 mm)

 

271mm

 

 

 

 

7-3/4 to 10-3/8 in.

 

 

 

 

 

 

 

 

 

 

 

 

(197 to 264 mm)

 

 

 

 

 

 

DVP-FBHT

 

 

 

 

 

 

Horizontal

28-1/2 in.

 

 

 

 

 

Termination Cap

 

 

 

 

 

 

724 mm

 

 

 

 

 

 

13-1/2 in.

 

 

 

 

DVP-FBHT

 

343 mm

 

 

 

 

DVP-FBHT

 

 

 

SLP90

SL-2DVP

 

 

 

 

 

 

SLK-SNKD

 

 

 

 

 

 

 

 

 

Snorkel

 

 

 

 

 

Termination Cap

 

 

 

 

 

Figure 16.4 SLP Series Vent Components

 

 

ASSEMBLY

 

 

Heatilator •

GDST3831I

2127-900 Rev. K • 7/12

57

Image 57
Contents Models What to do if you smell gasHOT Surfaces Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupElectrical Information FinishingLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesMinimum Framing Dimensions Constructing the Appliance ChaseClearances TOP View Fireplace Opening Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination LocationsInches U.S.A Covered Alcove ApplicationsTo Install the Heat Shield Install Support BracketsContinue Adding Vent Components CorrectApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsUse of Flex Vent Vent Diagrams Top Vent Horizontal Termination One ElbowV1 Minimum H1 Maximum V1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Two ElbowsV1 Minimum H1 + H2 Maximum V1 + V2 Min Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions V1 Minimum Maximum V1 + V2 Min Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Securing and Leveling the Appliance Appliance PreparationAssemble Vent Sections Installing Vent PipeSecuring the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Installing Decorative Ceiling ComponentsAssemble and Install Storm Collar Installing Metal Roof FlashingInstalling Vertical Termination Cap Installing Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 17 Venting through the wall Install Horizontal Termination CapFuel Conversion Gas InformationGas Pressure Gas ConnectionOptional Accessories Requirements Wiring RequirementsElectrical Information Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Receiver Wall Switch Installation for Fan Optional Junction Box InstallationFinishing Sides using a 300 F minimum sealant. Refer toFacing Material Metal front faces may be covered with non-combustibleSplatter Guard To install the Splatter GuardTo Remove the Splatter Guard To Close the Lower Access PanelAppliance Setup Models ST-550T-IPI. GDST3831I Install the Log AssemblyNotch Install Trim Kits and Surrounds Air Shutter SettingAir Shutter Settings Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Specifications. Polish flame sensing rod with fine steel wool Appliance Dimension Diagram Electrical Access Left View Front View GAS Line Right ViewReference Materials  B. Vent Components Diagrams SLP-TVHW Vent Components Diagrams34 mm 330 mm14-1/16 357 mmDVP-TB1 Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPSLP-LPC Optional Wire HarnessLog Set Assembly Service PartsStocked At DepotStocked #9 Valve AssemblyService Parts List Do not Discard this Manual Contact Information