Heatiator GDST3831I owner manual  B. Vent Components Diagrams

Page 55

B. Vent Components Diagrams

6-1/2 in.

165 mm

8-3/4 in.

222 mm

6-5/8 in.

168 mm

SLP45

45° Elbow

 

6-1/2 in.

 

165 mm

 

6-1/2 in.

6 in.

165 mm9-1/4 in.

235 mm

152 mm

6-5/8 in. 168 mm

9-7/8 in.

251 mm

SLP90

90° Elbow

Effective

Height/

Length

SLP PIPE

10-7/8 in.

276 mm

Effective Height/Length

Pipe

inches

mm

SLP4

4

102

 

 

 

SLP6

6

152

SLP12

12

305

SLP24

24

610

 

 

 

SLP36

36

914

SLP48

48

1219

 

 

 

SLP6A

2 - 6

51 - 152

SLP12A

2 - 12

51 - 305

 

 

 

SLP-FLEX-2

24

610

SLP-FLEX-3

36

914

 

 

 

SLP-FLEX-5

60

1524

SLP-FLEX-10

120

3048

EFFECTIVE HEIGHT/

LENGTH

SLP-FLEX-PIPE

8-7/8 in.

225 mm

SLP-HVS

Horizontal Pipe

Support

8-11/16 in.

220 mm

8-11/16 in. 220 mm

SLP-FS

Ceiling Firestop

1-1/2 in. 38 mm

12 in.

305 mm

1-1/2 in.

 

 

 

 

12 in.

38 mm

 

 

 

 

305 mm

 

 

 

 

 

SLP-WS

Wall Shield Firestop

5-1/2 in. 146 mm

Figure 16.2 SLP Series Vent Components

Heatilator • GDST3831I • 2127-900 Rev. K • 7/12

55

Image 55
Contents What to do if you smell gas ModelsHOT Surfaces Homeowner Reference Information CongratulationsUser Guide Table of ContentsFinishing Appliance SetupTroubleshooting Electrical InformationLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Fan Kit optionalGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Remote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningLogs Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesConstructing the Appliance Chase Minimum Framing DimensionsClearances TOP View Fireplace Opening Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination LocationsInches U.S.A Covered Alcove ApplicationsCorrect Install Support BracketsTo Install the Heat Shield Continue Adding Vent ComponentsUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyUse of Flex Vent Top Vent Horizontal Termination One Elbow Vent DiagramsV1 Minimum H1 Maximum V1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Two ElbowsV1 Minimum H1 + H2 Maximum V1 + V2 Min Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions V1 Minimum Maximum V1 + V2 Min Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Securing and Leveling the Appliance Appliance PreparationAssemble Vent Sections Installing Vent PipeSecuring the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Installing Decorative Ceiling ComponentsAssemble and Install Storm Collar Installing Metal Roof FlashingInstalling Decorative Wall Components Installing Vertical Termination CapHeat Shield Requirements for Horizontal Termination 17 Venting through the wall Install Horizontal Termination CapGas Connection Gas InformationFuel Conversion Gas PressureCode CSA C22.1 Wiring RequirementsOptional Accessories Requirements Electrical InformationIntellifire Ignition Wiring Diagram with Remote Receiver Wall Switch Installation for Fan Optional Junction Box InstallationMetal front faces may be covered with non-combustible Sides using a 300 F minimum sealant. Refer toFinishing Facing MaterialSplatter Guard To install the Splatter GuardTo Remove the Splatter Guard To Close the Lower Access PanelAppliance Setup Models ST-550T-IPI. GDST3831I Install the Log AssemblyNotch Air Shutter Setting Install Trim Kits and SurroundsAir Shutter Settings Symptom Possible Cause Corrective Action TroubleshootingIntellifire Ignition System Specifications. Polish flame sensing rod with fine steel wool Electrical Access Left View Front View GAS Line Right View Appliance Dimension DiagramReference Materials  B. Vent Components Diagrams SLP-TVHW Vent Components Diagrams357 mm 330 mm34 mm 14-1/16DVP-TB1 Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPSLP-LPC Optional Wire HarnessAt Depot Service PartsLog Set Assembly StockedStocked #9 Valve AssemblyService Parts List Do not Discard this Manual Contact Information