Heatiator GDST3831I Finishing, Facing Material, Sides using a 300 F minimum sealant. Refer to

Page 45

13 Finishing

 

 

 

 

 

 

 

 

 

 

 

A. Mantel and Wall Projections

 

 

 

 

 

 

WARNING! Risk of Fire! Comply with all minimum clear-

 

 

 

1/2 in.

ances as specified. Framing closer than the minimums list-

 

TOP VIEW

 

 

 

Min.

ed must be constructed entirely of noncombustible materi-

 

 

 

 

als (i.e., steel studs, concrete board, etc.) Failure to comply

 

 

 

 

could cause fire.

 

 

 

 

 

 

 

 

 

FIREPLACE

 

 

 

 

 

 

 

 

 

 

 

 

3-1/4 in.

 

 

 

 

 

 

 

 

 

 

 

OPENING

 

Note: All

 

 

 

 

 

 

 

 

 

 

Min.

Unlimited

measurements

 

 

 

 

 

 

CEILING

 

 

 

 

 

in inches.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: Clearance from opening to

 

 

MAX.

 

 

 

 

 

 

 

 

perpendicular wall.

 

 

 

 

 

 

12

 

 

 

 

Figure 13.3 Combustible Mantel Leg or Wall Projections

 

 

 

11

 

 

 

 

 

(Acceptable on both sides of opening)

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

8

9

 

 

 

 

 

 

 

 

 

 

7

 

 

 

 

32

 

B. Facing Material

 

 

 

 

 

 

 

 

 

 

 

5

6

 

 

 

 

 

 

MIN.

Metal front faces may be covered with non-combustible

 

 

 

 

 

 

12 13

4

 

 

 

 

 

10 11

 

 

materials only.

 

 

3

 

 

6

7

8 9

 

 

• Facing and/or finishing materials must not interfere with

 

4

5

 

 

 

 

 

air flow through louvers, operation of louvers or doors,

 

 

 

 

 

 

 

 

 

or access for service.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Facing and/or finishing materials must never overhang

TOP OF HOOD OR FIREPLACE OPENING

 

into the glass opening.

 

 

 

 

 

 

 

 

 

 

 

• Observe all clearances when applying combustible

 

 

 

 

 

 

 

 

 

 

materials.

 

 

 

 

 

 

 

 

 

 

 

Seal joints between the finished wall and appliance top

Figure 13.1 Minimum Vertical and Maximum Horizontal

 

 

and sides using a 300 °F minimum sealant. Refer to

 

 

Figure 13.3.

 

 

Dimensions of Combustibles

 

 

 

WARNING! Risk of Fire! DO NOT apply combustible

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

materials beyond the minimum clearances. Comply with

Note: All

 

 

 

 

 

 

 

 

all minimum clearances to combustibles as specified in

measurements

 

 

 

 

CEILING

 

 

this manual. Overlapping materials could ignite and will

in inches.

 

 

 

 

 

 

MAX.

 

 

 

 

interfere with proper operation of doors and louvers.

 

 

 

 

 

 

 

 

 

 

 

 

18

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

Finish wall material may be

 

 

 

 

 

11

 

 

 

 

 

combustible - Top and Sides

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

32

 

 

 

 

 

 

 

 

9

 

 

 

 

 

 

 

 

 

 

 

 

 

MIN.

 

 

 

 

0 in.

 

 

 

 

 

 

14

 

 

 

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

7

 

 

 

7

 

 

 

 

 

 

 

6

 

4

5

6

 

 

 

 

 

 

 

 

5

2

3

 

 

 

 

 

 

 

 

 

4

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOP OF HOOD OR FIREPLACE OPENING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0 in.

 

0 in.

 

 

 

 

 

 

 

 

 

 

High Temperature Sealant (300° F/149° C min.)

Figure 13.2 Minimum Vertical and Maximum Horizontal

 

 

Top and Side Seal Joint

 

 

 

Figure 13.4 Noncombustible Facing Diagram

Dimensions of Non-Combustibles

 

 

 

Heatilator • GDST3831I • 2127-900 Rev. K • 7/12

45

Image 45
Contents Models What to do if you smell gasHOT Surfaces Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupElectrical Information FinishingLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Remote ControlGasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianVenting LogsIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesMinimum Framing Dimensions Constructing the Appliance ChaseClearances TOP View Fireplace Opening Mantel and Wall ProjectionsVent Termination Minimum Clearances Termination LocationsInches U.S.A Covered Alcove ApplicationsTo Install the Heat Shield Install Support BracketsContinue Adding Vent Components CorrectApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsUse of Flex Vent Vent Diagrams Top Vent Horizontal Termination One ElbowV1 Minimum H1 Maximum V1 Minimum H1 + H2 Maximum Top Vent Horizontal Termination Two ElbowsV1 Minimum H1 + H2 Maximum V1 + V2 Min Top Vent Horizontal Termination Three ElbowsExhaust restrictor Instructions V1 Minimum Maximum V1 + V2 Min Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Combustible Wall PenetrationPipe SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Securing and Leveling the Appliance Appliance PreparationAssemble Vent Sections Installing Vent PipeSecuring the Vent Sections Assemble Slip SectionsDisassemble Vent Sections Installing Decorative Ceiling ComponentsAssemble and Install Storm Collar Installing Metal Roof FlashingInstalling Vertical Termination Cap Installing Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 17 Venting through the wall Install Horizontal Termination CapFuel Conversion Gas InformationGas Pressure Gas ConnectionOptional Accessories Requirements Wiring RequirementsElectrical Information Code CSA C22.1Intellifire Ignition Wiring Diagram with Remote Receiver Wall Switch Installation for Fan Optional Junction Box InstallationFinishing Sides using a 300 F minimum sealant. Refer toFacing Material Metal front faces may be covered with non-combustibleSplatter Guard To install the Splatter GuardTo Remove the Splatter Guard To Close the Lower Access PanelAppliance Setup Models ST-550T-IPI. GDST3831I Install the Log AssemblyNotch Install Trim Kits and Surrounds Air Shutter SettingAir Shutter Settings Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Specifications. Polish flame sensing rod with fine steel wool Appliance Dimension Diagram Electrical Access Left View Front View GAS Line Right ViewReference Materials  B. Vent Components Diagrams SLP-TVHW Vent Components Diagrams34 mm 330 mm14-1/16 357 mmDVP-TB1 Horizontal Termination CAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPSLP-LPC Optional Wire HarnessLog Set Assembly Service PartsStocked At DepotStocked #9 Valve AssemblyService Parts List Do not Discard this Manual Contact Information