Pelco
C2410M-J
manual
Install Dome And Trim Ring, Turn on power to the camera and monitor
Specs
Install
Warranty
Adjustments
Safety
Page 7
Page 6
Page 8
Image 7
Page 6
Page 8
Contents
I N S T A L L A T I O N
150 Series Camclosure Integrated Camera System
C2410M-J2/08
In-CeilingMount
Contents
Important Safety Instructions
Radio and Television Interference
Regulatory Notices
MOUNTING DIRECTLY TO A WALL OR CEILING
Installation
INSTALL BACK BOX
Description
MOUNTING TO CEILING TILE
INSTALL CAMERA
Proper camera orientation
INSTALL DOME AND TRIM RING
Turn on power to the camera and monitor
NOTE The screws are installed at an angle
VERTICAL PHASE 24 VAC OPERATION ONLY
Adjustments
GENERAL
Specifications
ELECTRICAL
WARRANTY
PRODUCT WARRANTY AND RETURN INFORMATION
RETURNS
Comments
REVISION HISTORY
Manual #
Date
Tel 1-559/292-1981 Fax 1-559/348-1120
Worldwide Headquarters 3500 Pelco Way
Clovis, California 93612 USA USA & Canada
Tel 800/289-9100 Fax 800/289-9150 International
Related pages
All Install page
Adapter Installation for Sun Microsystems PCI
Installation Instructions / Warranty for Axor 06890XX0
Installing Printer Software in Windows for Samsung CLX-8385ND Series
Installing a Dimm for Intel D975XBX2
Step Four Install Remote Deflector Control Cable for Ariens 921024
Installing Start8 for ASRock B85iCafe4
Browse & install apps for Motorola 68000202880-A
Installing/removing the server in/from the rack for Fujitsu RX330
Installation DE L’APPAREIL Dans LE Boîtier Mural for GE 3800
Preinstalled for HP 680689-001
What accessories are necessary for proper installation with the
Sharp AN-52AG4
?
Top
Page
Image
Contents