Stovax (P)8135, (P)8143, (P)8119, (P)8127, (P)8136, (P)8144, (P)8120, (P)8128 manual Commissioning

Page 22

INSTALLATION INSTRUCTIONS

COMMISSIONING

6.COMMISSIONING

6.1Close all windows and doors to the room, check all controls, and allow fire to burn on maximum for 5 minutes. Test for spillage of flue products using a smoke match. Pass the lighted smoke match along the top front edge just inside the opening or canopy. See diagram 34.

34

6.2If the fire spills, run for a further 10 minutes and re-check. If there is still spillage, disconnect the fire and seek expert advice

6.3If there are extractor fans in the room or adjacent rooms, the spillage test must be repeated with the extractors running on maximum.

6.4The burner pressure on this appliance is pre-set, provided the correct inlet pressure is obtained at the test point on the inlet connection, with the appliance on full, the appliance will work correctly. Carrying out a gas rate test will check the correct operation.

( The test points on the gas valve are not used on this appliance.)

22

Image 22
Contents Aspen, Chamonix & Tahoe Decorative Gas Basket Fires Contents Flue Check Pass Fail Appliance Commissioning ChecklistGAS Check Lighting the Appliance User InstructionsGeneral Turning the Appliance OFFUpgrading Your Fire Cleaning the FireArrangement of Fuel BED Components Coal & Pebble Layout Small Aspen & Chamonix Coal & Pebble Layout Medium Chamonix, Large Aspen & Chamonix Coal & Pebble Layout TahoeLog & Driftwood Layout Small Aspen & Chamonix AR1276 Log & Driftwood Layout Tahoe Running Oxygen Depletion SensorFlame Failure Device ServicingHigh Site Requirements Installation InstructionsInstallation of the GAS Supply Flue and Chimney RequirementsControl Upgrade Appliance LocationInstallation InstallationSafety Precautions UnpackingArrangement of Fuel BED Components AR1265 AR1268 AR1277 AR1274 AR1278 AR1285 Commissioning CommissioningServicing Instructions Servicing / Fault Finding ChartsServicing Requirements Ignition Functional Check Ignition Functional CheckFault Finding Charts Flame Failure Functional CheckFire Removal Replacing PartsIgnition Lead Piezo ODS Pilot UnitMain Injector Magnetic UnitPrimary Aeration Plate GAS Valve Engine Assembly Air Box Gasket Pilot Assembly DatabadgeChanging Between GAS Types Natural Gas Components LPG Gas ComponentsService Records Member of the Stovax Group